Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Stability of Backfilled Cross-panel Entries During Longwall MiningBy Brad Seymour
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof SupportBy Dale A. Didcoct
Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c
Jan 1, 1982
-
Prediction Of Subsurface Subsidence For Longwall Mining OperationsBy Yi Luo
Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs
Jan 1, 2000
-
Engineering Geophysics - Mine Subsidence Risk Assessment StudyBy Kanaan Hanna
Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally
Jan 1, 2011
-
Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics InvestigationBy K. Y. Haramy
Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr
Jan 1, 1988
-
Electromagnetic Seam Wave Mapping Of Roof Rock Conditions Across A Longwall PanelBy Larry Stolarczyk
The mining industry would benefit greatly by imaging geologic conditions well in advance of mining. In layered deposits such as coal, trona, quartz, and potash, natural waveguides form and enable elec
Jan 1, 1999
-
Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
Analysis of Entry Stability Associated with Multi-seam Mining - A Case StudyBy Jisheng Han
Interaction effect exists when two or more neighboring seams are mined. The mining activity in one seam causes stress redistribution and strata movement in both the roof and floor. When the thickness
Jan 1, 2005
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 MineBy J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)By Vincent Scovazzo
Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u
Jan 1, 2002
-
An Area Calculation of the ARBS Support IntensityBy Ihsan B. Tulu, Keith A. Heasley, Aanand Nandula
"The objective of this paper is to present the development of a software tool that will assist in an area calculation of the Analysis of Roof Bolting Systems (ARBS) support intensity while incorporati
Jan 1, 2018
-
The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone MinesBy Simon H. Prassetyo
Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre
Jan 1, 2011
-
Design Considerations For Cable Truss Secondary Supports In Roadways Of Underground CollieriesThe purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in-si
Jan 1, 1992
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone StrataBy J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
Cyprus Shoshone Tailgate Roof Control: Case StudyBy Andrew P. Schissler
Cyprus Shoshone is an underground coal mine in southern Wyoming owned by Cyprus Coal Company, a subsidiary of Cyprus Minerals Company. To date, seven longwall panels have been extracted from the pitch
Jan 1, 1993
-
Yield Pillar Applications--Impact On Strata Control And Coal ProductionThis paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Prediction of Roof Fall Rate in Coal Mines Using Fuzzy LogicBy Ebrahim Ghasemi
Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred
Jan 1, 2011
-
Monitoring Railroad Response To Mining Subsidence And Assessment Of Subsidence Effects On On Railroad - A Case StudyBy Yi Luo
The responses of a section of railroad to ground subsidence process was monitored as it was undermined by a longwall panel. The subsidence data collected and the observations made through this monitor
Jan 1, 1994
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)By Gabriel Esterhuizen
The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability
Jan 1, 2004