Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)By Kewal K. Kohli
An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a
Jan 1, 1992
-
A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine RoofBy Syd Peng
In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l
Jan 1, 2005
-
Multiple-Seam Mining - A State-Of-The-Art ReviewBy Chris Haycocks
The relevant literature concerning ground control, mine planning and reserve conservation in multi- seam mining is reviewed. Factors affecting interaction, interaction mechanisms, and design guideline
Jan 1, 1990
-
New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)By Chris Mark
The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi
Jan 1, 2002
-
Economic Evaluation Of Subsidence Damage Mitigation TechniquesBy David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining MethodsBy Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
Roof Instability Rating (RIR) System and Its Application at Enlow Fork MineBy John C. Stankus
ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m
Jan 1, 2001
-
Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas
Jan 1, 2001
-
Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress ReportBy Yi Luo
Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und
Jan 1, 2002
-
A Comprehensive Computer Model For Predicting Dynamic Subsidence For Longwall OperationsBy Y. Luo
This paper presents a number of mathematical models for predicting the different phases of the complete surface subsidence process associated with underground longwall mining. A computer program devel
Jan 1, 1992
-
Geomechanical Substantiation Of Extraction Of Undermined Ore DepositBy M. V. Kurlenya
The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo
Jan 1, 1990
-
A Novel System For Automatic Installation Of Cement Grouted Roof BoltsBy A. Mahyera
BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual
Jan 1, 1984
-
Rockbolting For Highly Stressed RoadwaysBy Holger Witthaus
The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m
Jan 1, 2000
-
Quality Management For Grouted RockboltsBy Dieter Wittenberg
The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n
Jan 1, 2000
-
Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete SupportsBy E. Bauer
During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc
Jan 1, 1988
-
Use Of Automated Resistivity System To Locate Potential Subsidence Areas Over Old MinesBy Richard G. Burdick
The Bureau of Mines', Denver Research Center has been conducting research for the past few years on the use of resistivity methods to locate abandoned mine workings. As this work has progressed,
Jan 1, 1982
-
Geotechnical Strata Characterisation Using Geophysical Borehole LogsBy Terry Medhurst
Geophysical logging is routinely undertaken as part of most Australian coal mining exploration programs. Typically, the main application is the determination of coal seam depth and the qualitative est
Jan 1, 2005
-
Three Dimensional Numerical Modelling Of Effects Of Subsidence On EscarpmentsBy Leigh J. Wardle
Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri
Jan 1, 1992
-
Scale Model Studies To Investigate The Effects Of Various Stressfields On The Stability Of Pillars Between Mine Roadways (359d84ec-978c-4bf2-a810-72bdf384bacc)By K. Goshtasbi Goharizi
This paper discusses experimental results of physical scale models employed to study the stability of a pillar between rectangular roadways. A programme of laboratory investigations utilising a bi-axi
Jan 1, 1992
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993