Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Alternative To A Manual Torque Check On Roof BoltsBy Joseph A. Cybulski
In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve
Jan 1, 1990
-
A Liquid Settlement System for Measuring Roof Sag During Development Mining - A Comparison Between Place Change Mining and a Miner?BolterBy Andy L. Shaffer
A novel liquid settlement system (LSS) was installed in advance of mining at a western United States (U.S.) longwall mine to measure total roof sag from the time of cutting to days after mining during
Jan 1, 2014
-
Effect of In Situ Stresses on the Stability of Coal Mine Development WorkingsBy Murali Gadde
Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat
Jan 1, 2004
-
Effects Of Mining On Underground Infrastructures In The German Hard Coal SectorBy Anton Sroka
The German hard coal production predominantly derives from underground multiseam mining activities. Beside common surface damages, ?inner mine damages? on underground infrastructures (i.e. main roads,
Jan 1, 1999
-
Laboratory Investigation of Confinement-Dependent Mechanical Behavior of a Utah CoalBy Bo-Hyun Kim, Steve Berry, Mark K. Larson
"When coal pillar bursts occur, they involve the sudden expulsion of coal and rock into the mine opening. These events occur when relatively high stresses in a coal pillar, which serve as support in u
Jan 1, 2018
-
Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)By Wei Wu
A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri
Jan 1, 1992
-
Progression of Longwall Gateroad Support as Conditions Change at Lodestar Energy's Baker MineBy David Miller
Longwall gateroad support can be supplied by a variety of methods. The system of support also needs to be flexible as conditions change. This is especially true in the complex geological conditions of
Jan 1, 1998
-
Strata Behavior Monitoring of the Sub-Inclination Fully Mechanized Top-Caving Face in Steeply Dipping Extra Thick Coal SeamBy Dongfeng Yun, Zhu Liu, Wendong Cheng, Zhendong Fan, Dongfang Wang, Yuanhao Zhang
"For the purpose of studying the strata behavior due to multislicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams, the shield support pressures
Jan 1, 2016
-
Cable Bolting with Low Air Power ? A Solution?By Matt Leeming
Several of the underground mines in the UK require a significant number of cable bolts to be installed, remedially, to control worsening roadway conditions. Often the access is limited and the only po
Jan 1, 2007
-
Evaluation of Rock Excavation Technologies for Seismically Active MinesBy S. Paul Singh
"The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating
Jan 1, 2010
-
Mechanics of Rib Deformation—Observations and Monitoring in Australian Coal MinesBy Yvette Heritage
"The risk of fatalities from rib failure is still prevalent in the coal mining industry. This risk has prompted further research to be conducted on rib deformation in order to understand the mechanism
Jan 1, 2018
-
Applications of Microseismic Monitoring in China?s Underground Coal MinesBy Xiangxi Wu
Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of
Jan 1, 2012
-
Recent Experience Using Telltale Roof Monitoring SystemsBy David Bigby, Tim Ross, David Conover
"Extensive arrays of telltale roof monitoring instruments were recently installed in a Mexican copper mine and a large underground mined storage facility in the eastern U.S. The data were used to eval
Jan 1, 2010
-
The Evolution of Pre-Driven Recovery Roadways at Crinum MineBy Adam Mackenzie, Dan Payne, Yass-Marie Rutty
"Historically, the Crinum mine has experienced significant falls of ground when longwall production slowed to prepare for recovery in weak roof areas. These conditions continue through the recovery pr
Jan 1, 2016
-
Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?By Wouter Hartman
Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int
Jan 1, 2012
-
Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas
Jan 1, 2001
-
Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle SandstoneBy Michael Murphy
A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.
Jan 1, 2014
-
BORE Bolt: No Milled Notch? No Hot Notch? No ProblemBy Stephen C. Tadolini, Anand Bhagwat
"Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens
Jan 1, 2018
-
Roof Bolter Synthetic Mesh Handling SystemBy Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange
"Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The
Jan 1, 2010
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal BedBy George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981