Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application

    By Dan Payne

    Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid

    Jan 1, 2006

  • SME-ICGCM
    Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments

    By Leigh J. Wardle

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri

    Jan 1, 1992

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Deformation Development Around Mine Roadways And Simulation Of Roadway Supports

    By E. Yasar

    This paper describes the use of the sand and plaster physical modelling technique to investigate the deformation around mine roadways using a variety of support methods in a particular form of stress

    Jan 1, 1995

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    Relocating Mining?Induced Seismicity at the Trail Mountain Mine

    By Meagan S. Boltz

    From October 2000 to April 2001 a local array of fourteen seismograph stations was deployed at the Trail Mountain Mine (TMM), an underground coal mine in Emery County, Utah, to locate mining-induced s

    Jan 1, 2012

  • SME-ICGCM
    Stability And Stress Evaluation In Mines Using In-Seam Seismic Methods

    By E. M. Williams

    The U.S. Bureau of Mines is investigating the use of in-seam seismic methods to monitor stress-induced changes in coal near the working face of longwall mines. Seismic surveys performed through a long

    Jan 1, 1994

  • SME-ICGCM
    Jenmmar Compression Roof Control System

    By John C. Stankus

    To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves

    Jan 1, 1990

  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    Flexibolt Flexible Roof Bolts: A New Concept For Strata Control

    A high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m

    Jan 1, 1993

  • SME-ICGCM
    Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report

    By Yi Luo

    Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und

    Jan 1, 2002

  • SME-ICGCM
    Ground Control Hazard Analysis In Multi-Seem Mining

    By R. Fraher

    Hazard analysis utilizes interaction mechanisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using characteriz

    Jan 1, 1992

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992

  • SME-ICGCM
    Ground Control Design For Multiple Seam Mining Using Finite Element Analysis

    By John Stankus

    Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre

    Jan 1, 1999

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    Practical Detection Of Underground Mine Roof Failure

    By David Bigby

    The paper describes research undertaken on an ECSC/K HSE project which investigated several potential physical principles which might be harnessed to provide a non-intrusive means of determining the e

    Jan 1, 2004