Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal Pillar Loading Mechanisms and Progress in Pillar Design

    By David Hill

    The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations

    Jan 1, 2008

  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987

  • SME-ICGCM
    Extraction Ratio In Thin Seams Assuring No Surface Subsidence

    By Kot F. v. Unrug

    The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar

    Jan 1, 2001

  • SME-ICGCM
    The Characteristics Of Mining-Induced Fractures In Overlying Strata

    By Jialin Xu

    Bed separations position, size, development characteristics and their influence factors have been analyzed in-depth by experimental and theoretical methods. The results show that the key strata determ

    Jan 1, 2003

  • SME-ICGCM
    Modelling Of Pillar Stability In Room And Pillar Mines

    By Douglas Morrison

    By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o

    Jan 1, 2003

  • SME-ICGCM
    Mathematical Modeling Of Strong Roof Beds In Longwall Mining

    By Xiaolin Wu

    Most coal bump occurrences in the U.S. are directly related to mining operations under strong roofs. An understanding of the behavior of bridging or cantilevering strong roofs over working longwall fa

    Jan 1, 1993

  • SME-ICGCM
    Full-face Pressure Monitoring in Medium-Weak Roof Condition

    By Syd S. Peng

    Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,

    Jan 1, 1997

  • SME-ICGCM
    Methods of Controlling Hard Roof in a Longwall Face

    By Linsheng Xu

    When coal seam is under the integral thick sandstone (or conglomerate), the structure of thick sandstone is integral and its strength is rather high. After coal is extracted, the roof is hanging and c

    Jan 1, 1986

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    Operational Experience With FLEXIBOLT Systems In Australian Coal Mines

    Since the initial development and trials of FLEXIBOLT flexible roof bolts, further comparative testing and product development has been completed as part of the changeover to this roof support system

    Jan 1, 1994

  • SME-ICGCM
    Subsidence Studies In Thick And Steep Coal Seam Mining

    By M. Y. Fisekci

    This paper concentrates on subsidence measurements, applied over the thick and steep seam mining in the Rocky Mountains Region of Western Canada. The studies to date indicate that two new subsidence m

    Jan 1, 1981

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    An Investigation into the Support Systems in South African Collieries

    By A. Wilkinson

    An investigation into the performance of support systems that are currently used in South African coal mines was conducted. Five most critical components of a support system have been identified. Thes

    Jan 1, 2005

  • SME-ICGCM
    Evaluation of Anchorage Integrity for Grouted Bolts in Weak Strata

    By W. C. Smith

    Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c

    Jan 1, 1987

  • SME-ICGCM
    The Elimination of Rock-fall Fatalities in Ontario Hardrock Mines

    By Douglas Morrison

    Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te

    Jan 1, 2003

  • SME-ICGCM
    In-Situ Pillar Strength Determination for Two-Entry Longwall Gates

    By H. N. Maleki

    Extensive measurements and underground observations in three Western U. S. coal mines are integrated in this paper to determine in-situ pillar load-deformation characteristics for narrow (30 it wide,

    Jan 1, 1988

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Changes in Stress and Displacement Caused by Longwall Panel Retreats

    By Ihsan B. Tulu, David F. Gearhart, Gabriel S. Esterhuizen

    "Ground deformation and support response was monitored in a longwall gateroad as part of a research project into gateroad stability under changing loading conditions. In this study, instrumentation wa

    Jan 1, 2017

  • SME-ICGCM
    Aspects of Chain Pillar Design in Relation to Longwall Mining

    By B Whittaker

    The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import

    Jan 1, 1987

  • SME-ICGCM
    In Situ Strength Testing of Rocks with the Borehole Penetrometer

    By Kot F. von Unrug

    One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll

    Jan 1, 1998