Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    Ground Control And Safety Considerations During Longwall Recovery

    By William J. Gray

    The Roof Control Division of MSHA's Pittsburgh Safety and Health Technology Center has been conducting a program to evaluate methods employed by the U.S. coal mining industry during recovery of l

    Jan 1, 1993

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Development of the 3D Numerical Modeling of Roof Bolts for Studying the Bolt/Rock Interaction

    By WenFeng Li

    A 3D roof bolt model with the consideration of rebar, resin, bearing plate, and resin/rock interface was developed for studying the bolt/rock interactions of the tensioned and fully-grouted resin bolt

    Jan 1, 2014

  • SME-ICGCM
    Experimental Observations and Interpretations on Fracture Networks, Strength and Deformability of Coal Masses under Three?Dimensional Loading Conditions

    By Peng-Fei He

    CT scanning tests were used to detect the pre-existing fracture systems of 36 cubical coal blocks. Systematic procedures were developed to construct the pre-existing fracture geometry of the cubical c

    Jan 1, 2014

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Definition of Ultra-close Multiple-seams and its Ground Pressure Behavior

    By Baisheng Zhang

    The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.

    Jan 1, 2005

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground Movements

    By Robert W. Bruhn

    A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a

    Jan 1, 1990

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Early Warning of Longwall Weighting Events and Roof Cavities Using Lva Software

    By David I. Hoyer

    It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours

    Jan 1, 2011

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case Study

    By William Monaghan

    Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conducting

    Jan 1, 2004

  • SME-ICGCM
    The Application of Pre-tensioned Grouted Tendons at Harworth Colliery, UK

    By Chris Adams

    The application of pre-tensioned tendon roof support assisted Harworth Colliery in their revival, from impending closure to lowest cost deep-mined producer in the UK, over just six months last year. T

    Jan 1, 2003

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    A New Rock Mass Failure Criteria Based On Rate Of Movement

    By Hamid Maleki

    A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved

    Jan 1, 1990

  • SME-ICGCM
    Development of a Laboratory Facility for Testing Shear Performance of Installed Rock Reinforcement Tendons

    By L. Mahony

    This paper describes the design, construction and commissioning testing program for a laboratory facility at the School of Mining Engineering, UNSW, Australia, aimed at evaluating reinforcement tendon

    Jan 1, 2005