Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Roof Quality Index For Stone Mines Using Borescope Logging

    By John Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has collected pillar and span data at 34 stone mines in 10 states to develop pillar and roof span design guidelines for underground st

    Jan 1, 2009

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • SME-ICGCM
    Advanced Development of the Radio Imaging Methods

    By Gerald Stolarczyk

    The Radio Imaging Method (RIM) is based upon electromagnetic (EM) wave propagation in the coal seam waveguide. The radio geophysics theory underlying RIM was developed by Hill of the national Institu

    Jan 1, 2006

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    Experimental and Numerical Study of Double Shearing of Bolt under Confinement

    By Naj Aziz

    The shear behaviour of reinforced rock joints is investigated for the bolt-grout-rock interaction and for failure mechanism. The effectiveness of the bolt application under lateral and axial loading c

    Jan 1, 2007

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Designing Free-Standing Steel Supports for Coal Mine Roof Support

    By Sam Spearing

    Free-standing supports are commonly used in coal mines in the USA, particularly when longwalling. A recent trend has been the development of prop supports. Prop supports have many advantages over bu

    Jan 1, 2008

  • SME-ICGCM
    Comparison among the Conventional Fully-Grouted Bolt, Combination Bolt, and One-Step Bolt Using Numerical Modeling

    By Andre Zingano

    The objective of this paper is to compare the behaviors of different types of roof bolts: (1) One-Step Bolt (OSB), (2) Fully grouted Bolt (RB), (3) Combination Bolt (CB), and (4) Torque tension Bolt

    Jan 1, 2007

  • SME-ICGCM
    Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)

    By Thomas Barczak

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

    Jan 1, 2007

  • SME-ICGCM
    Development of a Fault-Rupture Environment in 3D: A Numerical Tool for Examining the Mechanical Impact of a Fault on Underground Excavations

    By Bo-Hyun Kim, Mark K. Larson

    "While faults are commonly simulated as a single planar or non-planar interface for a safety or stability analysis in underground mining excavation, the real 3D structure of a fault is often very comp

    Jan 1, 2018

  • SME-ICGCM
    J?Crete: An Engineered Cementitious Composite Rock Coating

    By Alan A. Campoli

    The mining industry has long been searching for an effective structural application that prevents weathering and falls of loose rock, debris, and sediment. J-Crete is a fiber-reinforced, engineered, c

    Jan 1, 2012

  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012

  • SME-ICGCM
    Mine Seals ? A Rational Base for Design and Construction

    By Kot Unrug

    Mine seals are necessary in nearly every mine to isolate mined-out areas from the ventilation network. There is a large number of seals in active mines and that number continually increases as the de

    Jan 1, 2008

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012