Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    Comparative Study Of Western US Longwall Panel Entry Systems

    By Khamis Y. Haramy

    This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain

    Jan 1, 1989

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • SME-ICGCM
    Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal Operations

    By Michael Alber

    Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa

    Jan 1, 2008

  • SME-ICGCM
    Engineering Classification of Shales

    By Robert A. Siokler

    Approximately 75 percentage of the earth's land surface is comprised of shale or shale-like materials. Shale itself is composed of the residue from an almost infinite variety of weathered parent

    Jan 1, 1986

  • SME-ICGCM
    Gate Entry Design For Longwalls Using The Coal Mine Roof Rating

    By Chris Mark

    Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro

    Jan 1, 1993

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, CO

    By Collin Stewart

    Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac

    Jan 1, 2006

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • SME-ICGCM
    Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines

    By V. Eu. Anufriev

    Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re

    Jan 1, 1996

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)

    By Anthony Iannacchione

    Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o

    Jan 1, 1992

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    Design And Hazard Assessment Of Mine Ore Passes

    By M. J. Beus

    This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro

    Jan 1, 1996

  • SME-ICGCM
    A Simple Method Of Measuring Rock Fracture Toughness Using The Brazilian Test Method

    By H. Guo

    There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chevron -

    Jan 1, 1992

  • SME-ICGCM
    Premining Stability Analysis Of A Shaft Pillar At The Homestake Mine

    By J. C. Johnson

    High-grade ore found in a shaft pillar at the Homestake Mine prompted a request for a Bureau of Mines study to determine if selected areas of the shaft pillar could be mined without jeopardizing the s

    Jan 1, 1989

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006