Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)

    By Thomas Barczak

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

    Jan 1, 2007

  • SME-ICGCM
    Application of Chain Conveyor Cutter (Ccc) to Highwall Mininig System

    By Takashi Sasaoka

    Chain Conveyor Cutter (CCC) is a chainsaw-type machine and originally developed for the construction of underground walls and/or ground improvements. CCC was developed from the accumulated technology

    Jan 1, 2012

  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Comparison of L-Band and X-Band Differential Interferometric Synthetic Aperture Radar for Mine Subsidence Monitoring in Central Utah

    By Jessica M. Wempen, Michael K. McCarter

    "Differential Interferometric Synthetic Aperture Radar (DlnSAR), a satellite-based remote sensing technique, has potential application for measuring mine subsidence on a regional scale with high spati

    Jan 1, 2016

  • SME-ICGCM
    Development Of Roof Stitching As A Method Of Support In Indian Coal Mines

    By B. Singh

    The use of wire ropes has already been tried in a few countries for roof support In mines. But the use of scrap wire ropes, as a method of support on extensive scale has not been reported from anywher

    Jan 1, 1990

  • SME-ICGCM
    Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder

    By Gilles Rousset

    This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh

    Jan 1, 1989

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivage

    By Nikolaos Polysos

    To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure

    Jan 1, 2002

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    Rockburst Prevention in the German Coal Industry

    By Rudiger Baltz

    The sudden failure of bodies of rock is a serious problem commonly experienced in the international mining industry. These explosive releases of energy are referred-to as ?bumps?, ?outbursts? and ?roc

    Jan 1, 2008

  • SME-ICGCM
    An Integrated Approach To Subsidence Modelling And Prediction In The Collie Coal Basin (Western Australia)

    By Ian Misich

    A research programme has been undertaken to evaluate and predict the effect of total extraction of coal by underground methods on the superimposed strata, aquifer systems and ground surface in the Col

    Jan 1, 1993

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    The Influence of the First Layer Thickness of Immediate Roof on its Stability

    By Lixun Kang

    Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the

    Jan 1, 2005

  • SME-ICGCM
    Analysis Of The Seam Inclination Effect On Roof Stability

    By Hanjie Chen

    Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a

    Jan 1, 2000

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989