Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Field Verification of the Roof Fall Risk Index: A Method to Assess Strata Conditions

    By Anthony T. Iannacchione

    The Roof Fall Risk Index (RFRI) is a new method introduced by the National Institute for Occupational Safety and Health (NIOSH) to assist the underground stone mine operator in 1) assessing defects t

    Jan 1, 2006

  • SME-ICGCM
    Research on Mine Pessure Behaviors and Overlying Strata Movement Laws in Solid Backfill Mining Methods

    By Shengli Yang

    Solid backfill mining, as a green mining technology, has the advantages of a higher resource recovery, less damage to the environment and the ability to dispose of waste underground. It has been appli

    Jan 1, 2011

  • SME-ICGCM
    The Formation And Effects Of Transient Abutment Stress During Nonuniform Face Advance

    By George J. Karabin

    Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room

    Jan 1, 1982

  • SME-ICGCM
    Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete Supports

    By E. Bauer

    During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc

    Jan 1, 1988

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    Load Capacity and Bond Behavior of Resin Grouted Rock Bolts

    By Nic Slatalla

    Resin anchored rock bolts are an effective tool to control the deformation of an underground opening because they combine high support capacity with fast installation. However, there are still numerou

    Jan 1, 2006

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs (d7c8f4cb-6d76-4845-93df-11dd74a1d904)

    By Sean Harvey

    One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall

    Jan 1, 2009

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • SME-ICGCM
    A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines

    A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic

    Jan 1, 1988

  • SME-ICGCM
    Effects of Weak Bands on Pillar Stability in Stone Mines: Field Observations and Numerical Model Assessment

    By Gabriel Esterhuizen

    Observations of pillar conditions in limestone mines showed that the presence of weak bands in the limestone can result in pillar damage at stresses that are lower than one would otherwise expect. Th

    Jan 1, 2007

  • SME-ICGCM
    Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping Seam

    By Yongping Wu

    Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The

    Jan 1, 2013

  • SME-ICGCM
    Analysis of Multiple Seam Stability

    By Christopher Mark

    Multiple seam interactions are a major ground control hazard in many U.S. underground coal mines. The two most common types are: ? Undermining, where stress concentrations caused by previous ful

    Jan 1, 2007

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SME-ICGCM
    Sublevel Caving Mining Method for Extra-Thick Coal Seams

    By H. Nan

    Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full

    Jan 1, 2006

  • SME-ICGCM
    Extraction of Hard Coal Close to a Shaft

    By Peter Fischer

    Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal

    Jan 1, 2007

  • SME-ICGCM
    Control Of Mine Subsidence Utilizing Coal Ash As A Backfill Material

    By D. W. Evans

    Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method

    Jan 1, 1982