Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations

    By Kristineq Pankow

    The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th

    Jan 1, 2008

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999

  • SME-ICGCM
    Mobile Roof Support For Retreat Mining

    By H. Gene Wilson

    Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and

    Jan 1, 1990

  • SME-ICGCM
    Overburden Failure Characteristics of Extra?Thick Seam Using Top Coal Caving Mining Method at Tongxin Coal Mine

    By Zhijie Zhu

    In order to determine the overburden failure characteristics of extra-thick seam mining, EH4 electromagnetic image system and borehole televiewer survey were applied to panel 8100, Tongxin coal mine.

    Jan 1, 2014

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Experimental and Numerical Study of Double Shearing of Bolt under Confinement

    By Naj Aziz

    The shear behaviour of reinforced rock joints is investigated for the bolt-grout-rock interaction and for failure mechanism. The effectiveness of the bolt application under lateral and axial loading c

    Jan 1, 2007

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Control Mechanism of a Tensioned Bolt System in the Laminated Roof with a Large Horizontal Stress

    By Song Guo

    This paper will present the roof bolting finite element model developed at Jennmat Corporation used to study the control mechanism of the tensioned bolt system in the laminated roof with a large horiz

    Jan 1, 1997

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress

    By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen

    "Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee

    Jan 1, 2010

  • SME-ICGCM
    Surface Subsidence Due to the Combined Effects of Underground Coal Mining and Groundwater Withdrawal

    By Shu Cheng

    Abstract: Based on the consolidation theory of soil dewatering and land subsidence prediction methods in soil mechanics, preliminary analysis of surface subsidence and movement due to groundwater with

    Jan 1, 2002

  • SME-ICGCM
    Evaluation of Potential Impacts to Stream and Ground Water Due to Underground Coal Mining

    By Jimenez Leon, Christopher Newman, Boede Gabriel, Zacharias Agioutantis

    "Ground movements due to longwall mining operations have the potential to damage the hydrological balance within as well as outside the mine permit area in the form of increased surface ponding and ch

    Jan 1, 2016

  • SME-ICGCM
    Damage and Permeability Evolution Mechanisms of Coal under Unloading Condition

    By Zhengdong Liu, Kaizhong Zhang, Zhaonan Jiang, Yuanping Cheng, Biao Hu, Qingquan Liu, Ranpeng Wang

    "Major coal mining areas in eastern China have entered into the deep mining state. Gas pre-drainage, which has been successful at shallower depths, is not suitable at greater depths because of complex

    Jan 1, 2017

  • SME-ICGCM
    Alleviation of Rock Bursts by Identifying Burst-Prone Mine Workings

    By S. Paul Singh

    Rock burst is one of the most serious mining hazards, adversely affecting the safety, economy and productivity of mines. It is a sudden manifestation of the release of strain energy stored in the rock

    Jan 1, 2008

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine Entries

    By Asmaa Yassien

    Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column

    Jan 1, 2002

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Drainage Of Water From Abandoned Mines By Horizontal Drilling

    By Alan J. Zeni

    Drainage of water from abandoned underground mines has become important in recent years because of safety concerns when mining near abandoned works or reentering abandoned mines for further developmen

    Jan 1, 1990