Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Potential Problems Related To Mining Under Or Adjacent To Flooded WorkingsBy Stanley J. Michalek
Good planning is critical to operating a safe and efficient mining operation. As the shallow coal scams become depleted, attention turns toward deeper mineable seams or remnant coal reserves. It is be
Jan 1, 2000
-
Analysis Of Retreat Mining Pillar StabilityBy Christopher Mark
Preventing pillar line squeezes, massive pillar collapses, and coal pillar bumps is critical to the safe and efficient recovery of coal during retreat mining operations. To help prevent these problems
Jan 1, 1995
-
Pillar SizingBy Marek J. Mrugala
Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op
Jan 1, 1989
-
Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)By Shosei Serata
Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in
Jan 1, 1984