Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
Research on Coal and Gas Outburst Dynamic SystemBy Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi
"Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject
Jan 1, 2016
-
Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic MethodBy Shu Yan
The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi
Jan 1, 2005
-
Developments in Improving the Standard of Installation and Bond Strength of Full Column Resin RoofboltsBy Peter Altounyan
Goedehoop Colliery in the Witbank Coalfield of South Africa produces some 8 million tonnes of coal from fully mechanised room and pillar mining methods, using resin anchored bolts as roof support. Inv
Jan 1, 2003
-
The Implementation of Rock Mechanics Into a Multiple Level Limestone MineBy David A. Newman
In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine
Jan 1, 2014
-
Rockburst Control Measures at INCO's Creighton MineBy P. Oliver
Rockburst conditions were first encountered at Inco's Sudbury area operations in the mid 1930's when mining advanced to below the 610 m (2000 ft.) horizon. Now, mining is being carried out a
Jan 1, 1987
-
Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash MineBy Alexandra Garcia
A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th
Jan 1, 2014
-
Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow MineBy Robert J. Coutts, Dan A. Payne
"The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part
Jan 1, 2010
-
Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam ChamberBy Xicai Gao
With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e
Jan 1, 2013
-
An Alternative for More Productive Rib Bolting in Underground Mining ApplicationsBy Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
Stereological Sampling And Analysis For Characterizing Discontinuous Rock MassesBy J. K. Owens
As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I
Jan 1, 1994
-
Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical ApproachBy Rajagopala Reddy Kallu
After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo
Jan 1, 2007
-
Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from AustraliaBy Winton Gale
"The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t
Jan 1, 2010
-
Towards an Improved Stone Mine Pillar Design Methodology: Observations from a MistakeBy Francis Kendorski
The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech
Jan 1, 2007
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Coal Strength Variation by Lithotype for High-Volatile a Bituminous Coal in the Central Appalachian BasinBy John A. Rusnak
"This paper discusses the variation of coal strength based on the megascopic coal lithotypes for Central Appalachian high-volatile A coal beds. The composition of coal beds is complex and variable, de
Jan 1, 2017
-
Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ MonitoringBy Andreas Hucke
For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry
Jan 1, 2006
-
Optimizing Drilling Parameters for Improved Bolting Safety and PerformanceBy Darin Cotton, Tim Burgess, Tim Martin
"As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p
Jan 1, 2015
-
Numerical Modeling of Stress Distribution of Gateroads Subjected to Dynamic Pressure of Longwall Mining in the Immediate Overlying Seam, a Case StudyBy Ximeng Li
The entries that are subjected to dynamic pressure are much more difficult to maintain due to repeated disturbance. A case study of an entry stress distribution was performed using the FLAC3D program.
Jan 1, 2013
-
Progression of Longwall Gateroad Support as Conditions Change at Lodestar Energy's Baker MineBy David Miller
Longwall gateroad support can be supplied by a variety of methods. The system of support also needs to be flexible as conditions change. This is especially true in the complex geological conditions of
Jan 1, 1998