Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga MineBy David C. Oyler
The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i
Jan 1, 1987
-
Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)By Yi Luo
Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d
Jan 1, 2009
-
Machine Design Parameters For High Seam Truss Bolting ApplicationsBy G. Bucelluni
An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar
Jan 1, 1982
-
Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998
-
Flexible Support Design For Gateroads Of Retreating Longwall PanelsBy Erdal Unal
In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y
Jan 1, 1993
-
Application in Design for Close Proximity Multi-Seem MiningVirtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl
Jan 1, 1987
-
Seam Structure - An Important Criterion for Coal Pillar DesignBy Kot F. v. Unrug
In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m
Jan 1, 2005
-
Subsidence prediction using a laminated linear modelBy Miklos D. G. Salamon
If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this
Jan 1, 1989
-
A Study Of Displacement Field Of Main Roof In Longwall Mining And Its ApplicationBy Deren Zhu
Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by
Jan 1, 1989
-
An Analytical Approach For The Estimation Of Pillar StrengthA procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
Entry Stability Monitoring & Analysis For Longwall & Continuous Mining SystemsBy Wm. Mark Hart
Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa
Jan 1, 1995
-
Study Of Quantitative Impacts To Ground Water Associated With Longwall Coal Mining At Three Mines Sites In The Northern West Virginia AreaBy Denise Y. Dixon
The objectives of this study were to (1) document the hydrologic impacts of longwall mining on ground water, (2) identify the factors which affect the extent of dewatering, and (3) develop empirical t
Jan 1, 1988
-
Ropes mine crown pillar rock mechanicsBy W. G. Pariseau
A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to
Jan 1, 1989
-
A Review of Effective Parameters on Roof Fall During Retreat Mining in Room and Pillar Coal MinesBy Ebrahim Ghasemi
Problem statement: One of the most challenging safety problems in room-and-pillar coalmines is controlling roof falls during retreat mining. Roof falls not only cause both fatal and non-fatal injuries
Jan 1, 2012
-
System behavior analysis of the ground movement around a longwallBy Jian Wu
In this paper, the surrounding rocks and the supports in a longwall are taken as an integral, i.e. a system. The structural characteristics and behavior of the system are discussed based on in-situ ob
Jan 1, 1989
-
A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery EntriesBy John C. Stankus
The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un
Jan 1, 2014
-
Application of Highwall Mining System at Surface Coal Mine in ThailandBy Takashi Sasaoka, Pinyo Meechumna, Hiroshi Takamoto, Pipat Laowattanabandit, Akihiro Hamanaka, Kikuo Matsui, Hideki Shimada
"The EGAT Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 million tons of lignite annually to generate 2,400 mw of electricity. The surface mine pit covers is 4 by 7 km (
Jan 1, 2010
-
Safe Mining Evaluation of Coal Seam between Abandoned Upper and Lower Room-and-Pillard MinesBy Guorui Feng, Min Zhang, Yi Luo, Jian Yang, Yujiang Zhang, Junwen Bai
"Safe mining of coal seam sandwiched between abandoned upper and lower room-and-pillared mines (ULPM) ·is increasingly becoming the focus of attention in recent years, which is closely related to the
Jan 1, 2016
-
An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar miningBy W. M. Pytel
The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-
Jan 1, 1989
-
A Case Study of Topography?Related Stress Rotation Effects on Multi?seam StabilityBy Ihsan Berk Tulu
The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi
Jan 1, 2014