Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Practical Aspects Of Longwall Pillar DesignBy Christopher Mark
The past decade has provided a wealth of practical experience with longwall pillar design. Design formulas developed specifically for longwalls have proven their value in numerous applications. Analyt
Jan 1, 1990
-
Management of Floor Heave at Bulga Underground Operations—A Case StudyBy Kudret Tutuk, Serkan Saydam, Sungsoon Mo
"This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience
Jan 1, 2018
-
Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its InfluenceBy Wenbing Guo, Yi Tan, Erhu Bai
"It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn
Jan 1, 2016
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel StoplineBy William D. Gallant
This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr
Jan 1, 1990
-
Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt
Jan 1, 2001
-
Laboratory Study Of Shear Loading And Bolt Load Transfer Mechanisms Under Constant Normal Stiffness ConditionsOne of the most important parameters in rock/resin/bolt load transfer mechanism is the surface property of the bolt. Although there are various bolt surface configurations available in the market, ver
Jan 1, 1999
-
Design And Planning Of Lower Seam Longwall GateroadsCase study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be
Jan 1, 1995
-
Detailed Underground Measurements Of Roof Deflection And Bed SeparationBy André Vervoort
To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and pil
Jan 1, 1992
-
Geological Sensing - The Key To Increasing Miner SafetyBy J. R. M. Hill
The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te
Jan 1, 1992
-
Review Of Pillar Design Equations Including The Effects Of ConstraintBy C. Babcock
This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships
Jan 1, 1981
-
Structural Geological and Stress Controls on Natural Gas Inrushes in Southern West Virginia Longwall Coal MinesBy Sandin E. Phillipson
"On April 5, 2010 a massive dust-fueled explosion at a longwall mine in southern West Virginia claimed the lives of 29 miners. The mine had experienced large gas inrushes from the floor on two known p
Jan 1, 2016
-
The Quasi-Protection-Layer Model and Its Mechanisms of Gas DrainageBy Liu Xiao, Lin Xiaoying, Ma Geng, Tao Yunqi
"The soft coal in China has several issues, low permeability, high gas content and prone to gas outburst, making it difficult to drill and improve its permeability. Using the rock mass loading test, t
Jan 1, 2016
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Numerical Modeling of the Gob Loading Mechanism in Longwall Coal MinesBy Khaled Morsy
Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi
Jan 1, 2002
-
Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case StudyBy Erik C. Westman
The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re
Jan 1, 1993
-
Implementation and Evaluation of Roof Bolting in MICARE Mine IIBy Gustavo Herrera Rico
As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr
Jan 1, 1997
-
Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western ChinaBy Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li
"The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat
Jan 1, 2017
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral ApproachBy Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993