    Determination Of Basis For The Double Use Of Rectangular Rockbolted Roadways In The D/C Seam At The Auguste Victoria Mine

    By Karl H. Brandt

    In the Auguste Victoria mine a bolted rectangular roadway has been kept open for the first time in the seam D/C after retreat. The target of the project was to gain a basis for planning and experie

    Jan 1, 2001

  • SME-ICGCM
    Keynote Address for 24th International Conference on Ground Control in Mining, August 2- 4, 2005 - Like Deja Vu All Over Again

    By Peter B. Lilly

    Thank you, Syd, for the kind introduction and for inviting me to give the Keynote Address at this very prestigious gathering of some of the finest intellect and talent in the domestic and internationa

    Jan 1, 2006

  • SME-ICGCM
    The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

    By Kieran Black

    The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has

    Jan 1, 2007

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008

  • SME-ICGCM
    In-Situ Tests and Numerical Simulation about the Effect of Annulus Thickness on the Resin Mixture for Fully Grouted Resin Bolt

    By Andre Zingano

    The objective of this paper is to study the effect of annulus thickness on the quality of resin mixture for fully grouted resin bolt. Pullout and mixture tests were made in underground coal mines for

    Jan 1, 2008

  • SME-ICGCM
    Load Capacity and Stiffness Characteristics of Screen Materials Used for Surface Control in Underground Coal Mines (10e0c7b9-c7f2-4fd8-a923-cd572692ebf6)

    By Dennis R. Dolinar

    Screen material in the form of welded wire mesh and geogrids are used in underground coal mines to prevent the fall of small pieces of rock from the roof between roof bolts. Further, if the screen is

    Jan 1, 2006

  • SME-ICGCM
    Longwall Pace Bursts and Inadequate Caving: A Came Study

    By K. Y. Haramy

    Deep coal mines with strong roof and floor strata frequently encounter face and rib bursts. The burst problem becomes more severe with increased depth. While the exact causes of bursts are often diffi

    Jan 1, 1987

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • SME-ICGCM
    Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground Mines

    By Lorraine Kent

    Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var

    Jan 1, 2002

  • SME-ICGCM
    Development of Low Profile Remote Roof Bolting Module

    By Bill Kyslinger

    In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta

    Jan 1, 2006

  • SME-ICGCM
    A Step Towards Understanding The Behaviour Of Wider Roadways In South African Collieries

    By George B. Quaye

    Conventionally, roadways in South African collieries are 6 to 7 m wide. This dimension is chosen so as to allow maneuvrability of appropriate mine machinery and equipment, to meet production requireme

    Jan 1, 2001

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and Evaluation

    By Stephen Tadolini

    Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no

    Jan 1, 2002

  • SME-ICGCM
    Pillar Mining And Longwalling Below Massive Roof Strata: Geotechnical Issues And Two Case-Studies In Australia

    By Satyendra K. Singh

    If the extraction is beneath massive roof strata, the roof tends to 'bridge' across large spans without failing, the caving behaviour is complex and irregular. Understandably, these give ris

    Jan 1, 2000

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016

  • SME-ICGCM
    Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)

    By Thomas Barczak

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

    Jan 1, 2007

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009