Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Study of Periodic Weighting of Longwall Supports

    By Archie Richardson

    Periodic weighting of longwall supports occurs during retreat ofthe face under certain geologic conditions. Strong stratain the immediate and main roof tend to cantilever over the gob, weighting the s

    Jan 1, 1998

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Analysis of Roof and Pillar Failure Associated with Weak Floor at a Limestone Mine

    By Tim Miller, Michael M. Murphy, John L. Ellenberger, Gabriel S. Esterhuizen

    "A limestone mine in Ohio has had instability problems that have led to massive roof falls extending to the surface. This study focuses on the role that weak, moisture-sensitive floor has in the insta

    Jan 1, 2015

  • SME-ICGCM
    Methods To Determine Pillar Stress Distribution And Its Effect On Stability

    By David P. Conover

    The effects of stress distribution on pillar stability were evaluated through rock mechanics studies conducted in three underground room-and-pillar coal mines. Results of the three field instrumentati

    Jan 1, 1989

  • SME-ICGCM
    A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines

    A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic

    Jan 1, 1988

  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    Premining Stability Analysis Of A Shaft Pillar At The Homestake Mine

    By J. C. Johnson

    High-grade ore found in a shaft pillar at the Homestake Mine prompted a request for a Bureau of Mines study to determine if selected areas of the shaft pillar could be mined without jeopardizing the s

    Jan 1, 1989

  • SME-ICGCM
    Numerical Simulation of Reinforced Concrete Mine Seal Subjected to Explosion Loading

    By Khaled Morsy

    The tragic incidents at Sago and Darby coal mines in 2006 pointed out the need for stronger seals to resist the blast effects of violent gob explosions. Mine Safety and Health Administration (MSHA) ha

    Jan 1, 2008

  • SME-ICGCM
    Effects Of Subsidence On Steep Topography And Cliff Lines

    By Don Kay

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,

    Jan 1, 1992

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Support of Coal Mines in the United Kingdom

    By James Arthur

    In deep coal mining the support of the underground roadway is fundamental and without knowledge of the mechanics of ground control a mine is unlikely to be operating safely and efficiently. It is the

    Jan 1, 2002

  • SME-ICGCM
    Pillar Collapse at Welgedacht Colliery, South Africa: A Case Study

    By J. Nielen van der Merwe

    During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta

    Jan 1, 1999

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress report

    By Y. L. Sun

    The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the

    Jan 1, 1989

  • SME-ICGCM
    Roof Control Under Conditions of Shallow Depth and High Horizontal Stress Field -A Case Study

    By Yajie Wang

    Traditionally, roof falls are usually attributed to bad roof strata and high vertical stress related to the overburden depth. However, roof falls under shallow overburden depth are oflen caused by a h

    Jan 1, 1998

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME-ICGCM
    Field Test with Strain-gauged Friction Bolts at the Gold Hunter Mine, Mullan, Idaho, USA (f62ddf9f-aabd-4681-8d92-4a50602e035c)

    By Jeffrey Johnson

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

    Jan 1, 2003

  • SME-ICGCM
    Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt Systems

    By Kot Unrug

    The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning

    Jan 1, 2004