Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Weak Floor Stability During Perimeter Mining In The Illinois Basin Coal Mines (40fab914-2257-4efe-b587-9358b9303f41)

    By Murali M. Gadde

    Perimeter mining is a special form of very productive partial extraction method practiced at some mines in the United States. In the Illinois Basin mines where all major coal seams have weak underclay

    Jan 1, 2009

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt System

    By John D. VandeKraats

    Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su

    Jan 1, 1998

  • SME-ICGCM
    A Rock Mass Strength Concept For Coal Seams

    By George S. Kalamaras

    Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down

    Jan 1, 1993

  • SME-ICGCM
    Application of Updated Joint Detection Algorithm for the Analysis of Drilling Parameters of Roof Bolters in Multiple Joints Conditions

    By Jamal Rostami, Asok Ray, Samer S. Saab Jr., Wenpeng Liu

    Ground instability, such as roof or rib failures, is one of the most serious and frequent safety hazards that occur in underground mining, tunneling, and underground construction. The ground-related p

    Jan 1, 2017

  • SME-ICGCM
    Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, China

    By W. C. Lacy

    Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl

    Jan 1, 1989

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design

    By Peter Cain

    Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block

    Jan 1, 1993

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    An Investigation Into The Effectiveness Of Support Systems Combining Steel Supports And Rock Bolts Within Coal Mine Roadways

    By D. Reddish

    The combination of free standing steel supports, such as arches, and rock bolts (mixed support) has Frequently been in used in UK coal mine roadways when it is considered that the strata and/or enviro

    Jan 1, 2004

  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994

  • SME-ICGCM
    Evaluation of Rockburst Hazard from Core Testing

    By Michael Alber

    Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For

    Jan 1, 2004

  • SME-ICGCM
    Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner

    By Sanjay Kumar Singh

    The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas

    Jan 1, 2012

  • SME-ICGCM
    Evaluation of Rock Burst in Deep Coal Mining By Using the Forensic Engineering

    By Saeed Zhandi, Behdeen Oraee

    "Rock bursts remain an important problem in longwall coal mining. These bursts are due to a sudden and severe failure of rocks from a high stress concentration in deep underground excavations that occ

    Jan 1, 2015