Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Flexible Support Design For Gateroads Of Retreating Longwall Panels

    By Erdal Unal

    In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y

    Jan 1, 1993

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    Rock Mechanics Property Data Bank For Coal Measure Strata

    By G. C. Sun

    Rock mechanics properties, i.e. uniaxial and triaxial compressive strength, indirect tensile strength shear strength, Young's modulus, and poisson's ratio were collected for coal and related

    Jan 1, 1993

  • SME-ICGCM
    Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock Bolts

    By Clare Offner

    In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r

    Jan 1, 2000

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993

  • SME-ICGCM
    Geological Sensing - The Key To Increasing Miner Safety

    By J. R. M. Hill

    The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te

    Jan 1, 1992

  • SME-ICGCM
    Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry Modification

    By Luis Giraldo

    Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout

    Jan 1, 2005

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Application of Microseismic Monitoring to Longwall Geomechanics and Safety in Australia

    By Xun Luo

    In this paper we report on the use of microseismic monitoring techniques to investigate the fracturing process associated with longwall mining. The study was carried out at three mines in Australia an

    Jan 1, 1998

  • SME-ICGCM
    Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)

    By P. A. Gray

    Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c

    Jan 1, 1992

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • SME-ICGCM
    Stress And Stability In Coal Ribsides And Pillars

    By A. H. PH. D Wilson

    Compared to the rocks encountered in, say, metalliferous mining or tunnel drivage in igneous and metamorphic rocks, the strata associated with the coal measures are relatively soft. If excavations are

    Jan 1, 1981

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006

  • SME-ICGCM
    Anchorage Pull Testing for Fully Grouted Roof Bolts

    By Chris Mark

    Fully-grouted roof bolts comprise more than 80% of the primary roof supports used in U.S. coal mines. However, nearly 1,500 MSHA reportable, non-injury roof falls occur each year, and most of these ar

    Jan 1, 2002

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011