Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control IssuesBy Michael Kelly
Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ
Jan 1, 2005
-
Applications Of Probabilistic Analysis In Mine Ground ControlBy Gang Chen
Conventional methods designate a factor of safety, a deterministic number, to indicate the stability of a mine excavation. However, this deterministic description of excavation stability is frequently
Jan 1, 1996
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Effects of Specimen Age on the Uniaxial Compressive Strength and Moisture Content of Weak Coal Measure RocksBy Timothy Barton
The uniaxial compressive strength (UCS) is the most fundamental measurement used in geotechnical rock characterization for mine design. While there are standardized procedures for how to conduct UCS
Jan 1, 2008
-
Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ MonitoringBy Andreas Hucke
For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry
Jan 1, 2006
-
Design and Performance of a Longwall Coal Mine Water-Barrier PillarBy Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007