Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geomechanical Substantiation Of Extraction Of Undermined Ore DepositBy M. V. Kurlenya
The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo
Jan 1, 1990
-
A Case Study of Topography?Related Stress Rotation Effects on Multi?seam StabilityBy Ihsan Berk Tulu
The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi
Jan 1, 2014
-
First Caving And Its Effects--A Case StudyBy S. M. Hsiung
In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig
Jan 1, 1984
-
Rock Reinforcement LongevityBy Francis S. Kendorski
Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an
Jan 1, 2000
-
Ground Control Hazard Analysis In Multi-Seem MiningBy R. Fraher
Hazard analysis utilizes interaction mechanisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using characteriz
Jan 1, 1992
-
Utilization of Ground-Penetrating Radar to Determine Roof Competency in Underground Limestone MinesBy Tim Ross
J. M. Huber Corporation's Quincey Mine. an underground limestone mine located near Quincy. Illinois, has operated successfully and safely for many years utilizing roof bolts on a very limited bas
Jan 1, 2002
-
Statistical Regional Calibration Of Subsidence Prediction ModelsBy D. N. Cleaver
Like other influence function methods, the SWIFT subsidence prediction program, developed within the Mineral Resources Engineering Department at the University of Nottingham, requires calibration to r
Jan 1, 1995
-
Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal MinesBy Yunqing Zhang
Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co
Jan 1, 2004
-
Salt Pillar Design EquationBy Leo L. Van Sambeek
Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th
Jan 1, 1997
-
Shear Bond Characteristics in Grouted Cable BoltsBy Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Continuing Development of Innovative Cable Support SystemsBy John G. Oldsen
Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new
Jan 1, 1997
-
Research And Application Of Combined Reinforcement SystemBy Binchuan Zhang
The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding
Jan 1, 2001
-
Influence Of Partings In A Coal Seam On Long Term Pillar StabilityBy K. Biswas
So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part
Jan 1, 1995
-
Horizontal Stress Control In Underground Coal Mines (1dbd7295-90f8-4003-a003-9120dc19934c)By S. M. Matthews
The magnitude and orientation of the in situ stressfield has been determined as a key factor in controlling the stability of openings for both coal mine development and extraction. Monitoring of roadw
Jan 1, 1992
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case StudyBy Lance R. Barron
The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th
Jan 1, 1990
-
Formation of Face Headings Using Stress Relief at Asfordby MineBy John Cassie
The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la
Jan 1, 1997
-
Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress ReportBy Yi Luo
Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und
Jan 1, 2002
-
Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface StructuresBy Yi You
A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term
Jan 1, 1997
-
FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field TrialBy H. Yavuz
A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T
Jan 1, 2001