Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Specialty Truss System And Their Performance

    By Ben L. Seegmiller

    Specially truss systems? including the Intersection Truss®, Continuous Entry Truss®, Cutter Roof Truss® and Roktrus® have been used in many coal mines in the mid- west and western United States during

    Jan 1, 1990

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    Development of a New Roof Bolt Technology to Improve Gate- Road Performance

    By Vince Caggiano

    The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy o

    Jan 1, 2005

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    Monitoring Of The Interaction Effects Over A Longwall Panel In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The Phalen Colliery in the Sydney Coalfield is extracting the 2.6 m thick Phalen Seam by the panel and pillar longwall retreat method. Abandoned workings occur in the Harbour Seam 140 m above and over

    Jan 1, 1993

  • SME-ICGCM
    Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)

    By Jeffrey K. Whyatt

    The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the

    Jan 1, 2009

  • SME-ICGCM
    Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building

    By Gennaro G. Marino

    As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w

    Jan 1, 2013

  • SME-ICGCM
    Research on the Characteristics of Mine Pressure and Overlying Strata Movement in Downward Mining Longwall Panels in Steeply Dipping Seams

    By Jingyi Cheng

    Many longwall panels in China are laid out along the dip direction such that the direction of longwall retreat mining is along the strike direction of coal seams. Downward mining longwall panels in st

    Jan 1, 2013

  • SME-ICGCM
    Highwall Control At Homestake's Open Cut Mine

    By Don Berger

    Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm

    Jan 1, 1996

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Characterization Of Overburden Response To Longwall Mining In The Western United States

    By Khamis Y. Haramy

    The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time

    Jan 1, 1992

  • SME-ICGCM
    The Role Of Engineering And Geology In Analyzing Ground Control Conditions

    By David A. Newman

    Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f

    Jan 1, 1999

  • SME-ICGCM
    Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western China

    By Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li

    "The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat

    Jan 1, 2017

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    The Development of Active Cable Anchors for Primary Supports in Coal Mines

    By Scott A. Shapkoff

    High strength cable strand supports are predominately used as a supplemental means of ground control in longwall and development operations in the U.S. The advantages of cable strand supports have bee

    Jan 1, 2006

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine

    By Yong-Ming Jiang

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels

    By Andre Vervoort

    The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr

    Jan 1, 2000

  • SME-ICGCM
    The Control Of Surface Subsidence By Width/Depth Ratio And Chain Pillar Size In The Presence Of Competent Coal Measures

    By E. H. R. Schumann

    The local stratigraphy and composition of the coal measures, including competent dolerite sill and massive sandstone lavers is shown to have a restricting influence on the development and magnitude of

    Jan 1, 1988