Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    In-Situ Pillar Strength Determination for Two-Entry Longwall Gates

    By H. N. Maleki

    Extensive measurements and underground observations in three Western U. S. coal mines are integrated in this paper to determine in-situ pillar load-deformation characteristics for narrow (30 it wide,

    Jan 1, 1988

  • SME-ICGCM
    Implementation and Evaluation of Roof Bolting in MICARE Mine II

    By Gustavo Herrera Rico

    As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr

    Jan 1, 1997

  • SME-ICGCM
    Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case Study

    By Danny J. Van Roosendaal

    An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain

    Jan 1, 1995

  • SME-ICGCM
    New Methods and Technologies of Roofbolting in Australia Coal Mines

    By Mictck Rataj

    Methods of rock reinforcement in Australian coal mines are being advanced progressively through the better understanding of rock failure mechanisms around roadways and the-development of improved bolt

    Jan 1, 1997

  • SME-ICGCM
    Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of Weakness

    By Daniel W. H. Su

    Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr

    Jan 1, 1990

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case Study

    By William Monaghan

    Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conducting

    Jan 1, 2004

  • SME-ICGCM
    Evaluation Of Polyurethane Injection For Beltway Roof Stabilization In A West Virginia Coal Mine (4376a6c8-d15e-4751-9754-663f60fbf3a4)

    By Gregory Molinda

    Extremely difficult ground conditions were encountered in the main belt entry in a room and pillar mine in West Virginia. Several generations of supplemental support, including cable bolts, cribbing,

    Jan 1, 2004

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)

    By D. M. Shu

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur

    Jan 1, 1992

  • SME-ICGCM
    Overcoring Techniques to Assess in Situ Corrosion of Galvanised Friction Bolts

    The effects of corrosion upon the load bearing capacity and ultimate tensile strength of galvanised friction bolts were determined. Corrosion rates were measured by overcoring of the reinforcement ele

    Jan 1, 2005

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • SME-ICGCM
    Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting Efficiency

    During the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t

    Jan 1, 1990

  • SME-ICGCM
    Roof Control Under Conditions of Shallow Depth and High Horizontal Stress Field -A Case Study

    By Yajie Wang

    Traditionally, roof falls are usually attributed to bad roof strata and high vertical stress related to the overburden depth. However, roof falls under shallow overburden depth are oflen caused by a h

    Jan 1, 1998

  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001

  • SME-ICGCM
    Improving Design Methodology For Innovative Rock Mechanics Design

    By Dwayne C. Kicker

    This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a

    Jan 1, 1989

  • SME-ICGCM
    Innovative Concept In Tailgate Entry Support: Elimination Of Crib Blocks Through Utilization Of New High Capacity Roof Truss Systems (3aab4965-6f53-4caa-9e67-bf9dbe5d5a16)

    By John C. Stankus

    In this paper, an innovative concept in longwall tailgate support is discussed. This new concept utilizes a new high capacity roof truss system in lieu of conventional wooden crib block. The first fie

    Jan 1, 1994

  • SME-ICGCM
    Ground Control Criteria for Coal Reserve Optimization in Multiple-Seam Mines

    By Eric Westman

    Ground control problems caused by multiple-seam interaction frequently sterilize coal reserves. Interaction mechanisms differ for overmining and undermining and are controlled by mining, spatial. and

    Jan 1, 1997