Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)

    By Rao Pothini

    Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under

    Jan 1, 1992

  • SME-ICGCM
    Machine Design Parameters For High Seam Truss Bolting Applications

    By G. Bucelluni

    An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar

    Jan 1, 1982

  • SME-ICGCM
    Three-Dimensional Analysis Of Mine Dump Point Stability

    By Radoslaw L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li

    Jan 1, 1990

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Proposed Criteria for Assessing Subsidence Damage to Surface Structures

    By Swapan Bhattacharya

    Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste

    Jan 1, 1984

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    Design Of Roadway Support Using A Strain Softening Model

    By Jamal Hematian

    Understanding the behaviour of rocks in a high horizontal stress field, such as that in Australia, is critical when analysing the stability of underground structures. This paper addresses the signific

    Jan 1, 1994

  • SME-ICGCM
    Insitu Performance of One Step Bolts to New Zealand Thick Coal Seam Mining Environments

    By Richard Campbell

    Effective strata control, utilising fully encapsulated resin grouted roof bolts is dependent on the installed quality of the reinforcement elements. Resin based grouts are the main form of rock bolt

    Jan 1, 2006

  • SME-ICGCM
    Pillar Design and Roof Support for Controlling Longwall Headgate Subject to High Horizontal Stresses

    By D. W. H. Su

    A two-year study was conducted by CONSOL in a northern West Virginia coal mine to evaluate pillar design and support requirements to improve roof control in right-hand longwall headgates subject to hi

    Jan 1, 2003

  • SME-ICGCM
    A Novel System For Automatic Installation Of Cement Grouted Roof Bolts

    By A. Mahyera

    BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual

    Jan 1, 1984

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Risk Assessment: Multiseam - Single Seam Mining

    By L. Munsamy

    The bulk of primary mining at the Anglo Coal's Bank Colliery was carried out by drill and blast method, in a bord and pillar layout exploiting the No. 2 Seam. Secondary extraction, top/bottom coa

    Jan 1, 2004

  • SME-ICGCM
    Longwall Pace Bursts and Inadequate Caving: A Came Study

    By K. Y. Haramy

    Deep coal mines with strong roof and floor strata frequently encounter face and rib bursts. The burst problem becomes more severe with increased depth. While the exact causes of bursts are often diffi

    Jan 1, 1987

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    A Case Study of Topography?Related Stress Rotation Effects on Multi?seam Stability

    By Ihsan Berk Tulu

    The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi

    Jan 1, 2014

  • SME-ICGCM
    SDPS For Windows: An Integrated Approach To Ground Deformation Prediction

    By David Newman

    The latest version of the Surface Deformation Prediction Software (SDPS) package is presented through its application to a number of case studies. The package now exploits all the benefits of the Micr

    Jan 1, 2001

  • SME-ICGCM
    Overview of Safety Considerations with Highwall Mining Operations

    By George Gardner

    The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili

    Jan 1, 2002

  • SME-ICGCM
    Management of Floor Heave at Bulga Underground Operations—A Case Study

    By Kudret Tutuk, Serkan Saydam, Sungsoon Mo

    "This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience

    Jan 1, 2018

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993