Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)By Deno Pappas
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr
Jan 1, 2002
-
Planning And Design For Barrier Pillar Recovery Three Case HistoriesBy David A. Newman
Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu
Jan 1, 1995
-
Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata ZonesBy Martin Bolesta
The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination
Jan 1, 2001
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Application of Chain Conveyor Cutter (Ccc) to Highwall Mininig SystemBy Takashi Sasaoka
Chain Conveyor Cutter (CCC) is a chainsaw-type machine and originally developed for the construction of underground walls and/or ground improvements. CCC was developed from the accumulated technology
Jan 1, 2012
-
Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)By David Conover
The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo
Jan 1, 2009
-
Overmining In Kailuan, China Mining Area (d9eb7d79-18c1-4a77-a59a-53706a90764b)By Jun Han
Coal has been mined in the Kailuan mining area for more than 130 years. The remaining reserves consist of, in large part, coals that would have been considered economically unminable or technically no
Jan 1, 2009
-
The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall PanelsBy Rene Rodriguez
The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun
Jan 1, 1995
-
Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)By Thomas Barczak
A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the
Jan 1, 2007
-
Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow CylinderBy Gilles Rousset
This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh
Jan 1, 1989
-
A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal PillarsBy Yunxin Qiu
A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp
Jan 1, 1992
-
Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall RecoveryBy Bill Stormes
This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and
Jan 1, 2008
-
Application of Yield-Lok Bolt for Bursting and Convergence Grounds in MinesBy Rocky Wu
Rock bursts are one of the greatest challenges to ground control in the mining industry. With increasing mining depth and mining scale, there are more and more industry requirements on yielding rock s
Jan 1, 2011
-
Effects Of Subsidence On Steep Topography And Cliff LinesBy Don Kay
A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,
Jan 1, 1992
-
Beyond Coalbrook: Critical Review of Coal Strata Control Developments in South AfricaBy J. Nielen van der Merwe
Rock engineering research and technology development in South Africa only received serious attention in reaction to the Coalbrook disaster in 1960. At the time, a number of gaps in knowledge of rock r
Jan 1, 2006
-
Pillar Optimization For Initial Design And Retreat RecoveryBy Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003
-
An Overview Of The National Roof Evaluation Accident Prevention (REAP) ProgramBy J. M. Krese
This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac
Jan 1, 1988
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case StudyBy Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
Influence Of Support Capacity And Geometry On Tailgate SupportBy E. Hosca
Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail
Jan 1, 1994
-
Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)By T. M. Tharp
Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati
Jan 1, 1984