Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Formation of Face Headings Using Stress Relief at Asfordby Mine

    By John Cassie

    The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la

    Jan 1, 1997

  • SME-ICGCM
    An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed

    By George Mishra

    In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco

    Jan 1, 1981

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Field Test with Strain-gauged Friction Bolts at the Gold Hunter Mine, Mullan, Idaho, USA (f62ddf9f-aabd-4681-8d92-4a50602e035c)

    By Jeffrey Johnson

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

    Jan 1, 2003

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    Field Measurements of Chain Pillar Response to Longwall Abutment Loads

    By Christopher Mark

    Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess

    Jan 1, 1986

  • SME-ICGCM
    Numerical Modeling Of "Stiff" Backfill in the Coeur D'Alene Mining District (17e85e0c-8155-492f-9c87-d2b9dd6611c4)

    By Ed Van Eeckhout

    As part of a U.S. Bureau of Mines-sponsored project on the utilization of "stiff' backflll to minimize potential rock burst hazards, a finite element study was undertaken to predict stresses and

    Jan 1, 1984

  • SME-ICGCM
    Improvement in Pre-Tensioning of Strand Bolts in Australian Coal Mines

    By Mietek Rataj

    Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var

    Jan 1, 2002

  • SME-ICGCM
    Stooping Low Safety Factor Pillars At Goedehoop Colliery

    By Gift Makusha

    The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm

    Jan 1, 2003

  • SME-ICGCM
    Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine Works

    By Thomas L. Vandergrift

    With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern

    Jan 1, 2000

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    Root Causes of Groundfall Related Incidents in U.S. Mining Industry (2ced207f-73e6-4ab3-8c4e-7a683f4eb75c)

    By Kousick Biswas

    The main objective of occupational health and safety research is to minimize or eliminate the events that may cause fatal or non¬fatal injuries to human workers. A commonly used technique is to devise

    Jan 1, 2003

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    Characterization Of Overburden Response To Longwall Mining In The Western United States

    By Khamis Y. Haramy

    The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time

    Jan 1, 1992

  • SME-ICGCM
    The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)

    By Chris Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand

    Jan 1, 2002

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • SME-ICGCM
    Investigation of Subsidence Over AML: A Case Study

    By P. M. Lin

    The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even

    Jan 1, 1987

  • SME-ICGCM
    Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine

    By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker

    "Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high

    Jan 1, 2018

  • SME-ICGCM
    Strata Control Advances At Jim Walter Resources, Mining Division

    By Eddie Martin

    Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea

    Jan 1, 1988