Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Risk Assessment: Multiseam - Single Seam Mining

    By L. Munsamy

    The bulk of primary mining at the Anglo Coal's Bank Colliery was carried out by drill and blast method, in a bord and pillar layout exploiting the No. 2 Seam. Secondary extraction, top/bottom coa

    Jan 1, 2004

  • SME-ICGCM
    Visual Recognition of the Load of Roof-Bolts by an Indicator

    By Joachim Leonhardt

    Hundreds ofbolt-indicators were already used successfully in the German deep hard coal-mines to increase the safety and economy. The bolt-indicator offers the simple possibility to show roof-bolt (anc

    Jan 1, 2001

  • SME-ICGCM
    Roof Support Performance In High Stress Conditions

    By Thomas P. Mucho

    To document the performance of mine roof and roof support systems the U.S. Bureau of Mines (IJSBM) has been installing instrumentation at selected sites in U.S. coal mines. Much of this support and ro

    Jan 1, 1995

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    The Requirements of a Database to Store Geotechnical Data to Assist in Roof Support Design

    By Ross Seedaman

    The specification of roof support needs to consider rock strength, imposed ground stresses, and more importantly the bedding and joint structure of the immediate roof rocks. A database structure has b

    Jan 1, 2003

  • SME-ICGCM
    The Use Of Cribless Tailgates In Longwall Extraction

    By Russell Frith

    The paper defines the various operational advantages associated with the use of cribless tailgates during longwall extraction and considers the associated ground control issues that need evaluating to

    Jan 1, 2000

  • SME-ICGCM
    A Case Study Of A Deformation Mechanism Around A Two-Entry Gate-Road System Involving Probable Time-Dependent Behavior

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms around a longwall gate-road system in an underground coal mine. Of particular interest was roof defo

    Jan 1, 1995

  • SME-ICGCM
    Bolting Practice In Longwall Gateroads At The Miike Colliery

    By Kikuo Matsui

    Standing supports such as steel arches or square work supports along with the necessary struts and lagging have been traditionally employed in the longwall gateroads of the Japanese underground coal m

    Jan 1, 1993

  • SME-ICGCM
    Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)

    By Kewal K. Kohli

    An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a

    Jan 1, 1992

  • SME-ICGCM
    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    Computer Modeling Of Yield Pillar Behavior Using Post-Failure Criteria

    In this paper, the plastic increment theory was applied in a 2-D finite element model, and a generalized Von Mises yielding criterion adopted to simulate the progressive failure of coal pillars. Exten

    Jan 1, 1988

  • SME-ICGCM
    Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)

    By Wei Wu

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri

    Jan 1, 1992

  • SME-ICGCM
    Recent Developments in the Use of Seismic Tomography in Longwall Mines

    By Erik Westman

    Tomographic imaging, commonly known as a CAT-scan or CT-scan, is used in the medical field to generate a picture of the interior of a body. Current research is applying this method to bodies of rock s

    Jan 1, 2003

  • SME-ICGCM
    Numerical Modelling Of A Monitored Site In An Underground Coal Mine In The Bowen Basin (20bead43-67f8-4fda-8d73-d3f230de1fe6)

    By M. E. Duncan Fama

    The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and inter

    Jan 1, 1992

  • SME-ICGCM
    Innovative Concept In Tailgate Entry Support: Elimination Of Crib Blocks Through Utilization Of New High Capacity Roof Truss Systems (3aab4965-6f53-4caa-9e67-bf9dbe5d5a16)

    By John C. Stankus

    In this paper, an innovative concept in longwall tailgate support is discussed. This new concept utilizes a new high capacity roof truss system in lieu of conventional wooden crib block. The first fie

    Jan 1, 1994

  • SME-ICGCM
    Longwall Geomechanics, An Australian Perspective

    By Michael Kelly

    Longwall mining is the principal method of underground coal mining in Australia, with 70 million tonnes being produced by longwall mines in 1999. However, the mechanisms that control longwall geomecha

    Jan 1, 2000

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Analysis of Cutter Roof Using the Boundary Element Method

    By Mikko Ahola

    This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac

    Jan 1, 1987

  • SME-ICGCM
    Rock Compaction Caused By Dewatering In Poorly- Consolidated Sandstones

    By Hamid R. Nikraz

    This paper reports the finding of a comprehensive investigation carried out to evaluate the compaction characteristics of saturated sandstone aquifers in the Collie Coal Basin under conditions anticip

    Jan 1, 1993