Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)By Brian R. A. Wood
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t
Jan 1, 1992
-
Stability of a Gateroad Used Simultaneously for Two Retreating Longwall FacesBy Stanislaw Prusek
In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges
Jan 1, 2014
-
Use of a Laser Grid System for Accurate Roof Bolt LocationBy William Kendall
"A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo
Jan 1, 2016
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple SeamsBy Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
Strata Disturbance Prediction For Mining Beneath Surface Water And Waste ImpoundmentsBy Madan M. Singh
Mining under bodies of water such as oceans, lakes, rivers, streams, ponds, and other impoundments, is not a new technique. However, in the United States it has been fairly restricted to date. In orde
Jan 1, 1981
-
Comparison Of Multiple And Single Entry Roadways For Highly Stressed LongwallsBy Klaus Opolony
The world's most popular method of longwall mining requires multiple entry systems for the panels. In contrast to this mine layout the roadways in German coal mining are used for advanced mining
Jan 1, 2003
-
Deign of Support System for Mining Tunnels in Carboniferous Rock ConditionsBy B. N. Whittaker
The paper briefly reviews the type of support and stability problems encountered in mining tunnels in U.K. Carboniferous rock conditions, particularly the Coal Measures where almost all such tunnels a
Jan 1, 1987
-
Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case StudyBy P. Tsang
The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different
Jan 1, 1989
-
A Novel System For Automatic Installation Of Cement Grouted Roof BoltsBy A. Mahyera
BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual
Jan 1, 1984
-
Determination Of Classification Parameters For Clay - Bearing And Stratified Rock MassBy Erdal Unal
In underground mining today, safety and economical aspects demand a better understanding of the rock-mass conditions, particularly for design of underground mine openings excavated in weak and stratif
Jan 1, 1990
-
Ground Control Design For Multiple Seam Mining Using Finite Element AnalysisBy John Stankus
Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre
Jan 1, 1999
-
Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal MineBy Adrian L. Moodie
Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.
Jan 1, 2011
-
Detecting Strata Fracturing and Roof Failures from a Borehole Based Microseismic SystemBy Tara Bajpayee
Modern, highly productive underground mining operations need to assure the safety of their workforce by understanding where major strata fractures and roof failures could occur. Mines depend on a hos
Jan 1, 2008
-
MSHA Technical Review of Proposed Mine Designs for U.S.Underground Coal MinesBy Michael Gauna
Ground fall injuries and fatalities in United States underground coal mines have shown a diminishing trend. Advances in bolting and standing support systems have led to improved safety in underground
Jan 1, 2011
-
Renewed Interest In Prop Supports As A Replacement For Wood CribsBy Thomas M. Barczak
Wood cribs have been the dominant form of supplemental support in coal mining for many years. Recently, there has been a renewed interest in prop supports as a replacement for wood cribbing due to the
Jan 1, 1995
-
Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam InteractionBy Christopher Mark
Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov
Jan 1, 2012
-
Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat FarmlandBy Daniel Barkley
Underground coal mining in Illinois has a lengthy history dating back to the early 1800?s. High extraction underground mining has played a significant role in production through out this time. Mode
Jan 1, 2007
-
Field Monitoring of Rock Bolting Performance in Weak Roof StrataBy Tingkan Lu
To understand the reinforcing mechanisms of the fully grouted resin bolt and clarify its performance in weak roof strata, the field monitoring investigation using instrumented bolts has been conducted
Jan 1, 1998
-
Development of Low Profile Remote Roof Bolting ModuleBy Bill Kyslinger
In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta
Jan 1, 2006
-
A Simple Tool to Measure Stress in Mine BackfillBy A. MacG. Robertson
A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro
Jan 1, 1986