Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control Problems

    By George J. Karabin

    The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability

    Jan 1, 1994

  • SME-ICGCM
    An Investigation of the Causes of Cutter Roof Failure in a Central Pennsylvania Coal Mine: A Case Study

    By John L. Hill

    Cutter roof failure is a specific type of ground control problem which frequently results in massive roof failure. It is a cannon occurrence in coal mines of the Northern Appalachian Coal Sasin, causi

    Jan 1, 1984

  • SME-ICGCM
    Prognosis And Control Of Mining Induced Surface Subsidence And Ground Movements In The German Hardcoal Sector, Case Studies

    By Axel Preusse

    This paper shows basic considerations about the prognosis and prediction of surface subsidence and other ground movements in the German hardcoal industry. The following case studies describe experienc

    Jan 1, 2000

  • SME-ICGCM
    Moonee Colliery: Renewing The Economic Viability Of A Mine Using Microseismic And Hydraulic Fracturing Techniques In Massive Roof Conditions

    By Peter Hayes

    Moonee Colliery operates a longwall extraction system in the Great Northern seam of the Newcastle Coal Measures, approximately 100km north of Sydney, NSW. In the initial mine area of longwall block

    Jan 1, 2000

  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001

  • SME-ICGCM
    Study Of The Impact Of Mining Under Massive Roof At Datong Coal Mines, China (7e96e5f6-0b09-4bad-866d-2ffcd02d33be)

    By Song Yong Jin

    The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts, col

    Jan 1, 1992

  • SME-ICGCM
    Numerical Modelling Of A Monitored Site In An Underground Coal Mine In The Bowen Basin (20bead43-67f8-4fda-8d73-d3f230de1fe6)

    By M. E. Duncan Fama

    The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and inter

    Jan 1, 1992

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME-ICGCM
    Control Of Roadway Closure In Underground Coal Mines By Sidewall Weakening Technique

    One of the problems associated with the maintenance of roadways in underground coal mines is that of dealing with roadway closure. Sidewall weakening technique is based on the transference of the h

    Jan 1, 1990

  • SME-ICGCM
    Investigation of Some Alternatives to Timber Posts and Cribs

    By Gavin J. Faulkner

    This paper presents an investigation of some alternatives, and improvements to timber posts and cribs. The purpose is to find a cheaper, better, easy to install, and effective means to replace or impr

    Jan 1, 1986

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Shear Strength Characteristics of Soft Rock Joints Based on Constant Normal Stiffness Testing

    Large-scale shear apparatus is designed to investigate the shear hehaviour of simulated soft rock joints under constant normal stifmess condition. Regular saw-teeth profiles having inclinations betwee

    Jan 1, 1997

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • SME-ICGCM
    Crosshole Seismics: Applications In Mining

    By Richard E. Thill

    Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq

    Jan 1, 1989

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    Some Technical Considerations When Mining Under Bodies Of Water

    By John W. Fredland

    Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun

    Jan 1, 1982

  • SME-ICGCM
    A Novel Ground Control Program at Plateau Mining Company

    By Hamid Maleki

    A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble

    Jan 1, 1987

  • SME-ICGCM
    Geomechanical Substantiation Of Extraction Of Undermined Ore Deposit

    By M. V. Kurlenya

    The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo

    Jan 1, 1990