Surface Movement of Super-wide Longwall Panels Using Top-coal Caving MethodBy Cao Shenggen
Experiences in the developed countries have shown that continuous increase of panel width (or face length) is one of the major technical trends for high production high efficiency mines. Increasing th
Jan 1, 2003
-
Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal OperationsBy Michael Alber
Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa
Jan 1, 2008
-
Roof Bolting Application In Longwall Mining In Indonesia And JapanBy Herryal Anwar
The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that
Jan 1, 1999
-
Application of Yieldable and Cuttable Pump Crib in Longwall Recovery RoomBy Quanzhong Gu
Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room
Jan 1, 2004
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Strength and Deformation Characteristics of Coal under Cyclic LoadingBy Yongjie Yang
Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin
Jan 1, 2006
-
Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine EntriesBy Asmaa Yassien
Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column
Jan 1, 2002
-
Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal MinesBy Matthew J. DeMarco
Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t
Jan 1, 1993
-
Strata Movement of Protective Seam Mining with Large Interburden ?? A Case StudyBy Changsheng Song
With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained
Jan 1, 2008
-
Characterization of Internal Insertion Pressure During Installation of Fully Grouted BoltsBy Luis Giraldo
The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that
Jan 1, 2006
-
Experimental and Numerical Methodology Assessment of Load Transfer Capacity of BoltsBy Naj Aziz
n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me
Jan 1, 2005
-
International Experience with Longwall Mining into Pre-driven Rooms (7f55d3bb-2127-4b96-860d-e3684bbd8397)By David Oyler
Unusual circumstances may require that a longwall retreat into or through a previously driven room. The operation can be completed successfully, but there have been a number of spectacular failures wh
Jan 1, 1998
-
Parameters Affecting Resin-Anchored Cable Bolt Performance: Results Of In Situ EvaluationsBy Joseph C. Zelanko
Cable bolt support techniques. including hardware and anchorage systems, continue to evolve to meet U.S. mining requirements. For cable support systems to be successfully implemented into new ground c
Jan 1, 1995
-
25 Years of Ground Control Developments, Practices, and Issues in AustraliaBy Bruce Hebblewhite
This paper recognises the 25th year of the Morgantown International Ground Control in Mining Conference, by offering a twenty five year review of ground control in the Australian mining industry ? pri
Jan 1, 2006
-
Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)By Ross W. Seedsman
The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume
Jan 1, 1992
-
Microseismic Monitoring of Mountain Bumps and Bounces: A Case StudyBy J. L. Condon
The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.
Jan 1, 1987
-
Mining Under Strong RoofBy K. Y. Haramy
Strong roof helps minimize roof fall problems in coal mine entries. However, the Inability of strong roof to cave readily may contribute to major ground control problems In Iongwall and retreat mining
Jan 1, 1988
-
Prevention. Control and Management of Coal and Gas OutburstsBy Lu Jiam Zhang
Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di
Jan 1, 1987
-
Status Of Longwall Research In CSIROBy Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001