Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    Reflections on the Application of Geophysics to Ground Control

    By Peter Hatherly

    As a discipline, geophysics covers an enormous range of scales and applications - from planetary geophysics through to the monitoring of acoustic emissions of rock samples. Although it is not a core d

    Jan 1, 2006

  • SME-ICGCM
    Numerical Modeling Of "Stiff" Backfill in the Coeur D'Alene Mining District (17e85e0c-8155-492f-9c87-d2b9dd6611c4)

    By Ed Van Eeckhout

    As part of a U.S. Bureau of Mines-sponsored project on the utilization of "stiff' backflll to minimize potential rock burst hazards, a finite element study was undertaken to predict stresses and

    Jan 1, 1984

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions

    By Kirk W. McCabe

    RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un

    Jan 1, 1981

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • SME-ICGCM
    A Retrospective Assessment of Ground Control Research and Applications in the Coal Industry

    By Daniel W. H. Su

    This paper presents a retrospective assessment of ground control research and its successful application by CONSOL Energy over the past 25 years. Recognizing the need to improve the understanding of c

    Jan 1, 2011

  • SME-ICGCM
    Numerical Modeling as a Tool to Predict Pillar Condition and Assist in Mining Sequencing

    By P. Palmer

    Using 3D numerical modeling as a tool to predict rock behavior during mining extraction is still an uncommon practice at many underground operations. This paper will discuss how 3D numerical models we

    Jan 1, 2005

  • SME-ICGCM
    Coal Strength Variation by Lithotype for High-Volatile a Bituminous Coal in the Central Appalachian Basin

    By John A. Rusnak

    "This paper discusses the variation of coal strength based on the megascopic coal lithotypes for Central Appalachian high-volatile A coal beds. The composition of coal beds is complex and variable, de

    Jan 1, 2017

  • SME-ICGCM
    The Evaluation of Empirical Coal Pillar Strength Formula Based on Uncertainty Criterion

    By Navid Hosseini

    Several empirical equations to estimate coal pillar strength have been presented in academic studies. The development processes of these equations are similar and are usually obtained by fitting the m

    Jan 1, 2012

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME-ICGCM
    Application of Laser Scanning for Rock Mass Characterization and Discrete Fracture Network Generation in an Underground Limestone Mine

    By Juan J. Monsalve, Nino Ripepi, Richard Bishop, Jon Baggett

    "Terrestrial laser scanning (TLS) is a useful technology for rock mass characterization. A laser scanner produces a massive point cloud of a scanned area, such as an exposed rock surface in an undergr

    Jan 1, 2018

  • SME-ICGCM
    Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting Research

    By Jiulong Cheng

    Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep

    Jan 1, 2006

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009