Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    The Integration Of Geology And Engineering In Ground Control And Mine Planning For A Multi-Level Underground Limestone Quarry

    By D. Newman

    An underground limestone quarry, developed in the 1940's, transitioned from a surface quarry to an underground room-and-pillar operation. The quarry expanded to a second underground level when th

    Jan 1, 2001

  • SME-ICGCM
    Yield Pillar Applications--Impact On Strata Control And Coal Production

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Research on the Interaction Between Roof Strata and Shield Supports

    By Yuanwci Shi

    This paper discusses the results of research on the interaction between roof strata and shield supports including the active and passive supporting functions of the shield supports which prevents roof

    Jan 1, 1997

  • SME-ICGCM
    Field Measurements of Overburden and Chain Pillar Response to Longwall Mining

    By Daniel W. H. Su

    Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main

    Jan 1, 1987

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)

    By Swapan Bhattacharya

    United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr

    Jan 1, 1984

  • SME-ICGCM
    Load Capacity and Bond Behavior of Resin Grouted Rock Bolts

    By Nic Slatalla

    Resin anchored rock bolts are an effective tool to control the deformation of an underground opening because they combine high support capacity with fast installation. However, there are still numerou

    Jan 1, 2006

  • SME-ICGCM
    The Caterpillar HW300 Quickscan

    By Pieter-Jan Kleiterp

    Caterpillar has been involved in highwall mining since the purchase of Bucyrus in 2011. The Cat® HW300 is a continuation of the Superior Highwall Miner that was first sold in the USA in 1994. Currentl

    Jan 1, 2014

  • SME-ICGCM
    Stooping Low Safety Factor Pillars At Goedehoop Colliery

    By Gift Makusha

    The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm

    Jan 1, 2003

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Development of CAN Manipulator

    By Brian E. Perrine

    Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting

    Jan 1, 2013

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    Instrumentation and Monitoring For Pillar Extraction in a Deep, Faulted Uranium Mine (3da9a7b4-75c4-492e-843f-6defa6026a38)

    By Thomas R. Scotese

    A rock mechanics instrumentation and monitoring program was implemented during pillar extraction at Gulf Mineral Resources' Mt. Taylor Mine, the deepest uranium mine in the U.S. Three types of mo

    Jan 1, 1984

  • SME-ICGCM
    Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)

    By Brian White

    Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p

    Jan 1, 2002