Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated FloorBy Weidong Pan, Yinchao Yang, Baodong Zuo
Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining
Jan 1, 2017
-
The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby CollieryBy Brian Clifford
Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane
Jan 1, 2002
-
Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)By Keith Heasley
An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t
Jan 1, 2003
-
Support of Tunnels in South African Gold MinesBy L. Z. Wojno
Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee
Jan 1, 1987
-
The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground MovementsBy Robert W. Bruhn
A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a
Jan 1, 1990
-
Development of a Laboratory Facility for Testing Shear Performance of Installed Rock Reinforcement TendonsBy L. Mahony
This paper describes the design, construction and commissioning testing program for a laboratory facility at the School of Mining Engineering, UNSW, Australia, aimed at evaluating reinforcement tendon
Jan 1, 2005
-
Roof Falls And Caving In Longwall Mining OperationsBy Kot F. Unrug
Since the introduction of longwall systems, the prediction of roof behavior and support requirements have become the major issue referring directly to safety as well as productivity. In more recen
Jan 1, 1982
-
Coal Pillar Design in Tabas Central Mine of IranBy Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar
"The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the
Jan 1, 2010
-
Research on the Characteristics of Mine Pressure and Overlying Strata Movement in Downward Mining Longwall Panels in Steeply Dipping SeamsBy Jingyi Cheng
Many longwall panels in China are laid out along the dip direction such that the direction of longwall retreat mining is along the strike direction of coal seams. Downward mining longwall panels in st
Jan 1, 2013
-
Biaxial Horizontal Swelling Strains in West Virginia Coal Mine Roof Rocks in Response to Moisture AdsorptionBy Monte R. Hieb
Study of moisture-induced swelling strain in Pennsylvanian Period rocks of the Appalachian Plateau in West Virginia shows a 2:1 biaxial horizontal anisotropy which trends NW-SE. Oriented in-situ slabs
Jan 1, 2013
-
An Assessment Of Rockbolting In Geologically Disturbed Mine RoadwaysBy Erdal Akyol
The rockbolting method of support is employed widely in several countries in different of mines. Hard rock mines use this method extensively. Soft rock mines, such as coal mines, have employed standin
Jan 1, 1992
-
The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)By Chris Mark
Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand
Jan 1, 2002
-
Assessing Coal Bumps From Excess Energy in Finite Difference ModelsBy Ryan Garvey
A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess
Jan 1, 2013
-
Optimization of Chain Pillars Design in Longwall Mining MethodBy Kazem Oraee, Mehran Gholincjad, Navid Hosseini
"Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the
Jan 1, 2010
-
Status Of Longwall Research In CSIROBy Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001
-
Safety and Productivity Innovations in Mechanized BoltingBy Gregory Hinshaw
Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change
Jan 1, 1998
-
Application of Highwall Mining System at Surface Coal Mine in ThailandBy Takashi Sasaoka, Pinyo Meechumna, Hiroshi Takamoto, Pipat Laowattanabandit, Akihiro Hamanaka, Kikuo Matsui, Hideki Shimada
"The EGAT Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 million tons of lignite annually to generate 2,400 mw of electricity. The surface mine pit covers is 4 by 7 km (
Jan 1, 2010
-
Load Transfer Mechanics In Fully-Grouted Roof BoltsBy Maynard O. Serbousek
The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b
Jan 1, 1984
-
In Situ Strength Testing of Rocks with the Borehole PenetrometerBy Kot F. von Unrug
One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll
Jan 1, 1998
-
Floor Heave in Shallow Room-and-Pillar MiningBy André Zingano
This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40
Jan 1, 2002