Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Shield Monitoring To Forecast Severe Face Weightings At The South Bulga Colliery, NSW, AustraliaBy Jim Sandford
The South Bulga Colliery longwall operation, owned and operated by Cyprus Coal Australia. Oakbridge Pty. Ltd., and located near Singleton, NSW, is currently operating under an average 80-ft-thick (24-
Jan 1, 1999
-
The Coal Mine Roof Rating (CMRR) A Practical Rock Mass Classification For Coal MinesBy Gregory M. Molinda
The U.S. Bureau of Mines has developed a rock mass classification system for coal mine roof control. The Coal Mine Roof Rating System (CMRR) evaluates the structural competence of mine roof using simp
Jan 1, 1993
-
The Influence of Rock Mass Quality in Controlled Blasting (87c67f30-2368-4c33-b1ba-1ff98b35a5ef)By Paul Singh
Blasting is an integral part of mining activity and is an inherently destructive process. The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dyn
Jan 1, 2007
-
The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support DesignBy Thomas M. Barczak
The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a
Jan 1, 1987
-
Progress In The Development Of A Roof Bolt Design Methodology Based On Resisting ShearBy Ross Seedsman
There are many models for how roof bolts behave, one of which is prevention of shear along bedding. The basis of this model is that a roof beam will not delaminate if bedding parallel shear can be pre
Jan 1, 2000
-
Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt MineBy David B. Plumeau
The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv
Jan 1, 1981
-
Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NMBy P. E. Christensen
Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f
Jan 1, 1998
-
Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall RecoveryBy Thomas A. Bailey
Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c
Jan 1, 2006
-
Influence of joints on the elastic response of a LFUFL stope to FEM miningBy W. G. Pariseau
A new approach to the direct inclusion of the effects of joints and geologic structure in rock mechanics analyses is applied to an elastic analysis of stability of a Lucky Friday undercut and 4111 lon
Jan 1, 1989
-
Surface Subsidence Due to the Combined Effects of Underground Coal Mining and Groundwater WithdrawalBy Shu Cheng
Abstract: Based on the consolidation theory of soil dewatering and land subsidence prediction methods in soil mechanics, preliminary analysis of surface subsidence and movement due to groundwater with
Jan 1, 2002
-
Ground Pressure Control With Use Of Freezing Rocks On The Ore Deposits Of YakutiaBy G. P. Neobutov
The near surface inclined gold ore deposit is mined out at freezing temperature. The replacement of ore pillars by artificial freezing rocks during the rock pressures control in this conditions presen
Jan 1, 1996
-
Meeting the Challenges of Floor and Sidewall Strata Control in UK Deep Coal MinesBy Lorraine Kent
Excessive floor and side deformation are major problems in deep coal mine entries in Europe, and in particular in the UK where rockbolt support is used at depths of working of around 3000 ft. This has
Jan 1, 2014
-
The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs DivisionBy Michael Amick
Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa
Jan 1, 1993
-
Guidelines for the Management of Rock Related Instability in Strip Mines, AngloCoal, South AfricaBy Trevor Rangasamy
Technically based guidelines for managing rock related risks associated with strip mines in South African collieries are currently vague and are to a large extent based on experience and trial and err
Jan 1, 2008
-
The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case StudyBy A. W. Khair
This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan
Jan 1, 1986
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 MineBy J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead LineBy Axel Preusse
A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate
Jan 1, 2003
-
Underground Longwall Mining with the Impact of Disturbed Areas by Abandoned Gateroads and Small GobsBy Enguang Zhu, Kangning Zhang, Yang Li
"Due to the use of outdated mining technology or room and pillar mining process in small coal mines, the coal recovery ratio is only 10% - 25%. In many regions of China: the damage area caused by the
Jan 1, 2016
-
How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal SpecimensBy Gamal Rashed
This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi
Jan 1, 2013
-
Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)By D. M. Shu
A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur
Jan 1, 1992