Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development and Testing of a New Roof Prop

    By E. Bane Kroeger

    In underground coal mining, there is often a need for supplemental support for mine openings. In the past, one of the most common types of supplemental support was wooden posts that were installed aga

    Jan 1, 2005

  • SME-ICGCM
    Application Research of 3D Laser Scanning Technology in Monitoring Subsidence Area of Coal Mining

    By Feiya Xu, Syd S. Peng

    "As a highly efficient and new surveying and mapping technique, 3D laser scanning technology has been gradually applied to surface subsidence monitoring in mining areas. 3D laser scanning technology w

    Jan 1, 2018

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    An Evaluation Of Strata Behavior And Tailgate Support Performance At Eagle Nest Mine

    By T. P. Mucho

    Strata behavior and support performance were evaluated in a longwall tailgate test area at the Eagle Nest Mine near Van, WV. The mine operates in the Eagle coalbed which ranges in height from 4 to 6 f

    Jan 1, 1996

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Development And Evaluation Of A Floor-Bearing Capacity Test Apparatus

    By Daniel W. H. Su

    A floor-bearing capacity test apparatus was designed and constructed to determine the true bearing capacity of soft floor materials beneath coal pillars or longwall face supports. The apparatus has be

    Jan 1, 1993

  • SME-ICGCM
    Deformation Development Around Mine Roadways And Simulation Of Roadway Supports

    By E. Yasar

    This paper describes the use of the sand and plaster physical modelling technique to investigate the deformation around mine roadways using a variety of support methods in a particular form of stress

    Jan 1, 1995

  • SME-ICGCM
    First Caving And Its Effects--A Case Study

    By S. M. Hsiung

    In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig

    Jan 1, 1984

  • SME-ICGCM
    A Study of Periodic Weighting of Longwall Supports

    By Archie Richardson

    Periodic weighting of longwall supports occurs during retreat ofthe face under certain geologic conditions. Strong stratain the immediate and main roof tend to cantilever over the gob, weighting the s

    Jan 1, 1998

  • SME-ICGCM
    Mathematical Modeling Of Strong Roof Beds In Longwall Mining

    By Xiaolin Wu

    Most coal bump occurrences in the U.S. are directly related to mining operations under strong roofs. An understanding of the behavior of bridging or cantilevering strong roofs over working longwall fa

    Jan 1, 1993

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • SME-ICGCM
    How to Design an Efficient Roof Bolting Plan Based on Simple In-Mine Measurements

    By C. J. H. Brest van Kempen

    The techniques developed should provide a useful tool, not only during the initial formulation of a suitable bolting plan for a new section, but also for periodic check¬ing on the utilization factor

    Jan 1, 1986

  • SME-ICGCM
    Illinois Basin Coal Geology and Roof Control

    By Marvin B. Thompson

    "The depositional model for major Illinois Basin coalbeds is well documented and defined on a regional scale. The model was a driving force during past exploration for lower sulfur and thicker coal de

    Jan 1, 2010

  • SME-ICGCM
    Resin Annulus Size Effects On Rebar Bolt Pull Strength And Resin Loss To Fractured Rock

    By Al Campoli

    One of the critical variables affecting resin bolt performance is the size of the resin annulus, defined as the difference between the hole and bolt radius. The vast majority of the millions of resin

    Jan 1, 1999

  • SME-ICGCM
    Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software

    By Zach Agioutantis, Christopher Mark

    "Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha

    Jan 1, 2018

  • SME-ICGCM
    Ground Control In South African Coal Mines - A U.S. Perspective

    By Christopher Mark

    After the United States and Australia, South Africa has the largest. modern underground coal mining industry in the world. Historically, South Africa has been the cradle of many innovations in ground

    Jan 1, 1999

  • SME-ICGCM
    Tracking and Tracing in Terms of Transportation Logistics of Hard Coal Mines

    By Marcel0 Mondring

    Transportation and the logistic requirements are set very high for the German coal mining industry. Short transportation resources, crowded quarters, and long transportation distances to destinations

    Jan 1, 2014

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Development Of A Remote Reading Dual-Height Telltale System For Monitoring Mine Roof Deformation

    By David Bigby

    A remote reading dual height telltale system has been developed to provide mine management with early warning of impending roof failure. This system is a logical development from the visual dual heigh

    Jan 1, 2001