Numerical Simulation of Reinforced Concrete Mine Seal Subjected to Explosion LoadingBy Khaled Morsy
The tragic incidents at Sago and Darby coal mines in 2006 pointed out the need for stronger seals to resist the blast effects of violent gob explosions. Mine Safety and Health Administration (MSHA) ha
Jan 1, 2008
-
Violent Coal Pillar Collapse -A Case StudyBy André Zingano
Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground
Jan 1, 2004
-
Resin-Grouted Cables For Longwall Tailgate Support StabilityBy Stephen C. Tadolini
The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en
Jan 1, 1994
-
A Case History of Computer-Aided Lineament Analysis for Ground Control PlanningBy C. D. Peters
The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu
Jan 1, 1986
-
Subsidence Misconceptions And MythsBy Richard E. Gray
Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:
Jan 1, 1996
-
Seismic Tomography, an Ideal but Immature Tool for Coal Bump PredictionBy Erik Westman
Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo
Jan 1, 2008
-
In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs (d7c8f4cb-6d76-4845-93df-11dd74a1d904)By Sean Harvey
One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall
Jan 1, 2009
-
Application of Various Probing Methods for Rock Characterization in Boreholes Drilled for Roof BoltingBy Ali Naeimipour
Availability of accurate geological information about the rock mass surrounding a tunnel or mine working is the key to enhance and optimize the required ground support measures. Various approaches hav
Jan 1, 2014
-
Rock Characterization Using Time - Series Classification AlgorithmsBy Soheil Bahrampour
Development of measurement while drilling (MWD) systems for ground control applications in mining applications has recently been an active research topic. The main goal is to utilize the drilling info
Jan 1, 2014
-
Influence of Roof/Floor Interface on Coal Pillar PerformanceBy Kyle A. Perry
Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des
Jan 1, 2013
-
Mine Layout Deign for Coal Bump ControlBy Hamid Maleki
A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c
Jan 1, 1987
-
Transitional Geology and Its Effects on Development and Longwall Mining in Pittsburgh SeamBy Jun Lu, Mark Van Dyke, Daniel W. H. Su, Greg Hasenfus
"This paper presents the geologic and ground control challenges that were encountered by CONSOL Energy’s mining operations in southwestern Pennsylvania. A sandstone-to-limestone geology transition was
Jan 1, 2015
-
Design Considerations For Cable Truss Secondary Supports In Roadways Of Underground CollieriesThe purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in-si
Jan 1, 1992
-
Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through EntriesBy William Bookshar
The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f
Jan 1, 1998
-
Evaluation of Pillar Recovery in Southern West Virginia (0e64fb3d-0c07-4638-b455-a16004535ca1)By Chris Mark
Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted duri
Jan 1, 2002
-
Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine WorksBy Thomas L. Vandergrift
With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern
Jan 1, 2000
-
Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)By Holger Witthaus
Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci
Jan 1, 2009
-
Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension ProblemBy Guy Reed, Russell Frith
"Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h
Jan 1, 2017
-
Towards an Improved Stone Mine Pillar Design Methodology: Observations from a MistakeBy Francis Kendorski
The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech
Jan 1, 2007
-
Mining Through In-panel Entries and Full-face Recovery Room WithoutBy John Smyth
Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,
Jan 1, 1998