    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)

    By John A. Rusnak

    Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a

    Jan 1, 2000

  • SME-ICGCM
    Study on Environmental Management of Mining Subsidence Areas

    By Weijia Guo

    With the exploitation of coal resources, a large area of land had been affected by surface subsidence, causing conflicts between man and land to become more conspicuous by the day, affecting the life

    Jan 1, 2006

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SME-ICGCM
    Field Measurements of Chain Pillar Response to Longwall Abutment Loads

    By Christopher Mark

    Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess

    Jan 1, 1986

  • SME-ICGCM
    Multi-Scale Assessment Of Coal And Gas Outbursts Based On Fractal Measurements

    By Mingju Liu

    In this research, we measured fractal characteristics of over ten typical outburst areas on different scales and related them to their outburst proneness, in attempts to provide new methods for outbur

    Jan 1, 2000

  • SME-ICGCM
    Geophysics For The Detection Of Abandoned Mine Workings

    By Christopher Phillips

    In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic

    Jan 1, 2003

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Rock Mechanics Study Of Lateral Destressing For The Advance-And-Relieve Mining Method (2bf3b56c-1393-4658-a2e4-6e9ace0d24dd)

    By Hamid Maleki

    The advance-and-relieve method benefits from lateral destressing associated with mining in laminated rocks and a high horizontal stress regime. This stress control method is based on measurements show

    Jan 1, 2003

  • SME-ICGCM
    Characterization of Internal Insertion Pressure During Installation of Fully Grouted Bolts

    By Luis Giraldo

    The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that

    Jan 1, 2006

  • SME-ICGCM
    Modern Geotechnical Exploration And Mine Design

    By Patrick S. Artrip

    A deep mining operation in the Lower Kelly (Imboden) seam in Wise County, Virginia experienced severe ground control conditions in its attempt to develop reserves situated under increasingly higher co

    Jan 1, 1993

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    International Experience with Longwall Mining into Pre-driven Rooms (7f55d3bb-2127-4b96-860d-e3684bbd8397)

    By David Oyler

    Unusual circumstances may require that a longwall retreat into or through a previously driven room. The operation can be completed successfully, but there have been a number of spectacular failures wh

    Jan 1, 1998

  • SME-ICGCM
    Supercomputer Assisted Three-Dimensional Finite Element Analysis Of A Longwall Panel

    By Duk-Won Park

    The excavation of a longwall panel causes a continuous stress redistribution in the surrounding strata for every face advancement. The understanding of the behavior of rock to high level of stresses i

    Jan 1, 1989

  • SME-ICGCM
    Prediction Of Rock Cutting Performance Using Fracture Mechanics Principles - A Review (0b1a12ed-9606-4d46-b68d-eea006d52e76)

    By Gexin Sun

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process of

    Jan 1, 1992