Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Evaluation of Rock Burst in Deep Coal Mining By Using the Forensic Engineering

    By Saeed Zhandi, Behdeen Oraee

    "Rock bursts remain an important problem in longwall coal mining. These bursts are due to a sudden and severe failure of rocks from a high stress concentration in deep underground excavations that occ

    Jan 1, 2015

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mine

    By T. J. McMahon

    This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from

    Jan 1, 1989

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    Highwall Control At Homestake's Open Cut Mine

    By Don Berger

    Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm

    Jan 1, 1996

  • SME-ICGCM
    The Implementation of Rock Mechanics Into a Multiple Level Limestone Mine

    By David A. Newman

    In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine

    Jan 1, 2014

  • SME-ICGCM
    Recent Experience Using Telltale Roof Monitoring Systems

    By David Bigby, Tim Ross, David Conover

    "Extensive arrays of telltale roof monitoring instruments were recently installed in a Mexican copper mine and a large underground mined storage facility in the eastern U.S. The data were used to eval

    Jan 1, 2010

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Effects of Longwall-lnduced Stress and Deformation on the Stability and Mechanical Integrity of Shale Gas Wells Drilled through a Longwall Abutment Pillar

    By Daniel W. H. Su

    "This paper presents results from a recent study conducted to evaluate the effects of longwall-induced stresses and deformations on the mechanical integrity of shale gas wells drilled over a longwall

    Jan 1, 2016

  • SME-ICGCM
    Probabilistic Approach to Coal Pillar Design

    By Ben Fahrman

    The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf

    Jan 1, 2013

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Time–Lapse Photogrammetric Monitoring of an Underground Stone Mine

    By Brent A. Slaker, Michael Murphy, John Ellenberger, Erik Westman

    "Photogrammetry, as a tool for monitoring underground mine deformation, is an alternative to traditional point measurement devices, and may be capable of accurate measurements in situations where tech

    Jan 1, 2015

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    Economic Impact of Ascending Mine?Waters in Germany

    By Axel Preusse

    Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste

    Jan 1, 2013

  • SME-ICGCM
    Review of Evaluation and Design of Secondary Support Performance in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Quantitative evaluation of secondary support performance in longwall tailgates in U.S. coal mines was introduced with the U.S. Bureau of Mines (USBM) Wood Crib Performance Model. This model evaluated

    Jan 1, 2018

  • SME-ICGCM
    Illinois Basin Coal Geology and Roof Control

    By Marvin B. Thompson

    "The depositional model for major Illinois Basin coalbeds is well documented and defined on a regional scale. The model was a driving force during past exploration for lower sulfur and thicker coal de

    Jan 1, 2010