Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Towards a Real Time Response to Changing Strata Conditions on a LongwallBy P. Trueman
A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min
Jan 1, 2006
-
Investigation of the Stability of a Pillar Retreat Section at the Fletcher MineBy Doug Tesarik
Researchers from the National Institute for Occupational Safety and Health1 (NIOSH), together with employees from The Doe Run Company, are monitoring and evaluating the stability of a pillar retreat s
Jan 1, 2006
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine
Jan 1, 1998
-
Practical Stress Modeling for Mine PlanningBy Keith Heasley
As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines
Jan 1, 1998
-
Full-Scale Performance Evaluation of Mobile Roof SupportsBy Thomas M. Barczak
The performance characteristics of Mobile Roof Supports (MRS's) were evaluated through full-scale testing in the Strategic Structures Testing Laboratory at the National Institute for Occupationa
Jan 1, 1997
-
Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)By Thomas Barczak
A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the
Jan 1, 2007
-
Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry ModificationBy Luis Giraldo
Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout
Jan 1, 2005
-
Analysis of Highwall Mining Stability - The Effect of Multiple Seams and Prior Auger Mining on DesignBy D. Newman
The objective of this is paper is to review the current state of knowledge and practice in highwall mining (HWM). HWM has become a standard method in surface mining, commonly used alone or in conjunct
Jan 1, 2005
-
Optimizing Secondary Tailgate Support SelectionA model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United
Jan 1, 1996
-
A New Rockbolt Axial Load Measuring DeviceBy Hani Mitri
A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a
Jan 1, 2001
-
The Development and Planning of Multiple Level Underground Limestone MinesBy Bruce W. King, David A. Newman
"Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str
Jan 1, 2016
-
Investigation Of Blast Damage And Underground StabilityBy S. Paul Singh
The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper
Jan 1, 1993
-
The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)By Thomas Barczak
Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to
Jan 1, 2002
-
A New Approach to the Integrity Testing of Ground AnchoragesBy Andrew Starkey
Ground anchorage systems in the form of rock bolts are used extensively throughout the world as supporting devices for civil engineering structures such as bridges and tunnels. It is widely recognized
Jan 1, 2001
-
Modern Shield Technology: Better Than Ever But Still Not PerfectBy Thomas M. Barczak
A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer
Jan 1, 1999
-
Gob Canopy Roof Support for Difficult Natural ConditionsBy Jay Hilary Kelley
This paper proposes a modification of longwall roof support to meet new difficult mining conditions that are anticipated in the future. A gob canopy is a movable appendage attached on the rear of a lo
Jan 1, 1997
-
State Of The Art Testing Of Powered Roof SupportsBy Robert C. Garson
The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine
Jan 1, 1982
-
Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam MiningBy Axel Studeny
Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is
Jan 1, 2007
-
Violent Coal Pillar Collapse -A Case StudyBy André Zingano
Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground
Jan 1, 2004
-
Resin-Grouted Cables For Longwall Tailgate Support StabilityBy Stephen C. Tadolini
The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en
Jan 1, 1994