    Management of Initial Convergence Events at Broadmeadow Mine

    By D. G. Lynch, M. R. Martin, R. J. Coutts

    "Broadmeadow Mine is an underground longwall mine located in Central Queensland, Australia. The mine introduced a top coal caving (TCC) longwall face in 2013 but since then has experienced severe conv

    Jan 1, 2018

  • SME-ICGCM
    Plasticity Characteristics of the Immediate Floor Rocks in the Illinois Basin Coal Mines

    By Murali Gadde

    The immediate floor bed in the Illinois Basin coal mines is often comprised of weak plastic underclay material. Operational and stability problems were encountered in the past due to the low strength

    Jan 1, 2008

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Interaction Subsidence In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The paper presents previously unpublished results derived from an unique interaction moitoring program conducted in the Sydney Coalfield of Nova Scotia. An abandoned, sealed longwall gateroad was r

    Jan 1, 1996

  • SME-ICGCM
    Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive Environments

    By Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle

    "The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv

    Jan 1, 2016

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    Management of the Dynamic Phenomena of Rock Pressure in Underground Mines

    By Vladimir I. Klishin

    Complex method of ruling of rock pressure is considered in conditions of rapid roof subsidence. The purpose of this method is elaboration of emergency devices into hydraulic props. Also method of unlo

    Jan 1, 1997

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep Cover

    By Daniel W. H. Su

    Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.

    Jan 1, 2014

  • SME-ICGCM
    The Use of Pneumatic Stowing in Germany Considering Subsidence Aspects

    By Axel Preusse

    Stowing or waste fill is common in the German mining industry since the beginning of mining activities, With increasing mechanization, flat and gently inclined seams (0 -- 18) were mined. These mines

    Jan 1, 2002

  • SME-ICGCM
    Influence of Roof/Floor Interface on Coal Pillar Performance

    By Kyle A. Perry

    Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des

    Jan 1, 2013

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Study about the Dynamic Influences of Longwall Mining in the US on Surface Structures

    By Karsten Zimmermann

    The paper presents a study on the influence of face retreat rate in longwall coal mining on surface subsidence. It shows possibilities to influence dynamic ground movement by using a specific and con

    Jan 1, 2007

  • SME-ICGCM
    Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, CO

    By Collin Stewart

    Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac

    Jan 1, 2006

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009