Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    Mining Under Rivers In Fuxin Coal Mines

    By Liang Yin-Huai

    In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.

    Jan 1, 1990

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Controlled Blasting During Drifting In Hard Rock Mine

    By S. P. Singh

    Drifts are an integral component of underground mining. They provide access for men and material, means for transporting ore and rock and serve as air passageways. In view of their importance on the o

    Jan 1, 1990

  • SME-ICGCM
    Determination Of The Rock Strength From Portable Rock Tester

    By K. F. Unrug

    A new testing technique for the determination of the rock strength from portable rock tester is proposed. It is a quick and economical method that can determine the rock strength with reasonable accur

    Jan 1, 1990

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Delineation Of Abandoned Workings With An In-Seam Seismic Method

    By I. Geldmacher

    In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide

    Jan 1, 1990

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME-ICGCM
    Stability Of Interpanel-Pillar And Deformation Of Gateroad Due To Longwall Mining

    Retreat longwall method with re-use of gateroad has been traditionally employed in Japan, mainly because of the advantage of higher recovery. But the Miike Colliery has newly introduced the interpanel

    Jan 1, 1990

  • SME-ICGCM
    The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground Movements

    By Robert W. Bruhn

    A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a

    Jan 1, 1990

  • SME-ICGCM
    A Model Of Shield-Strata Interaction And Its Implications For Active Shield Setting Requirements

    By Thomas M. Baraak

    This paper evaluates factors which influence longwall support and strata interaction. The longwall system is composed of an immediate and main roof structure and three supporting foundations: 1) longw

    Jan 1, 1990

  • SME-ICGCM
    Specialty Truss System And Their Performance

    By Ben L. Seegmiller

    Specially truss systems? including the Intersection Truss®, Continuous Entry Truss®, Cutter Roof Truss® and Roktrus® have been used in many coal mines in the mid- west and western United States during

    Jan 1, 1990

  • SME-ICGCM
    Methods Of Controlling Thick And Strong Roof In Longwall Mining

    By Deren Zhu

    The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat

    Jan 1, 1990

  • SME-ICGCM
    Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel Stopline

    By William D. Gallant

    This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr

    Jan 1, 1990

  • SME-ICGCM
    Drainage Of Water From Abandoned Mines By Horizontal Drilling

    By Alan J. Zeni

    Drainage of water from abandoned underground mines has become important in recent years because of safety concerns when mining near abandoned works or reentering abandoned mines for further developmen

    Jan 1, 1990

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case Study

    By Lance R. Barron

    The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th

    Jan 1, 1990