Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Increased Productivity from Kidd Creek Copper Operations

    By C. J. Newman

    Production levels at the Kidd Creek copper operation increased during the 1980's by expansion of both the smelter and refinery and by major modifications to equipment which was causing bottleneck

    Jan 1, 1993

  • TMS
    The Application of CFD to the Design of Electric Furnaces

    By T. Plikas, L. H. Gunnewiek, L. Oshinowo

    "Electric furnace smelting is one of the principal unit operations for ferroalloy production, and increased process intensity, improved availability, minimal maintenance and a longer campaign life are

    Jan 1, 2004

  • TMS
    Falcondo Revisited

    By Edwin de Jesús Deveaux

    After 32 years of operations beneficiating lateritic nickel ore in a fully integrated pyrometallurgical complex, Falconbridge Dominicana (FALCONDO), situated at Bonao and La Vega Provinces, Dominican

    Jan 1, 2004

  • TMS
    Progress And Problems In The Modeling Of Non-Ferrous Processes (Keynote) (1b307cbc-620f-4a17-89d3-5e3ffdab3f54)

    By Arthur E. Morris

    Fifty years ago when Professor Yazawa began his career, the field of process simulation and modeling was in its infancy. Since then, tremendous progress has been made in our ability to model metal pro

    Jan 1, 2003

  • TMS
    The Industrial Non-Cyanide Hydrometallurgical Recovery Of Silver And Gold Utilizing Nitrogen Species Catalyzed Pressure Oxidation

    By Corby G. Anderson

    In the majority of industrial operations recovering gold and silver by hydrometallurgical means, cyanide is the predominant lixiviant. However, as an economic alternative, production of massive quanti

    Jan 1, 1998

  • TMS
    Process Control Modernization At The Inspiration Smelter

    By J. B. Winter

    The present Inspiration Consolidated Copper Company Smelter/Acid Plant complex located near Miami, Arizona, was designed and built specifically to conform to the ambient air quality standards imposed

    Jan 1, 1983

  • TMS
    Teaching Process Simulation In Eleven Easy Lessons Using Excel And Its Tools

    By Arthur E. Morris

    The primary market driver for improving process technology is innovation, which requires a skilled and educated workforce. However, many Materials Science and Engineering departments have eliminated e

    Jan 1, 2014

  • TMS
    Oxidation of FeCl3 Using Radicals Produced in a Non-Equilibrium Oxygen Plasma

    By David C. Lynch

    FeCl3 particulate of 10 to 100 um in diameter was reacted with radicals produced in an oxygen plasma at pressures between 1 to 20 Torr. The particulate, in a fluidized bed, was positioned above the pl

    Jan 1, 1996

  • TMS
    Mathematical and Physical Modeling of Non-Ferrous Metals Extraction Processes

    By J. W. Evans

    Mathematical modeling has now become a standard technique in the development of new technology and the improvement of existing technology in the processing industries. Physical modeling has a longer h

    Jan 1, 1993

  • TMS
    Startup and Reliability of Nickel Laterite Plants

    By Finlay Campbell

    Nickel laterite pressure acid leach plants and reduction roast plants have had a checkered history in their engineering, construction, startup and operational reliability. Many potential projects have

    Jan 1, 2004

  • TMS
    Optimization of a Tin-Lead-Smelting Furnace with the Aid of Statistical Modelling Techniques

    By S. C. Grund

    In secondary copper smelting as it is performed at Hüttenwerke Kayser plant in Lünen, tin-and lead-containing flue dusts are produced as intermediate products. These flue dusts are further processed i

    Jan 1, 1999

  • TMS
    Numerical Simulation of Fluid Flow and Heat Transfer in a Waste-Heat Boiler of the Outokumpu Flash Smelting Process

    Numerical simulation of the fluid flow and heat transfer has been carried out for a waste-heat boiler in an Outokumpu type copper flash smelter. In this boiler, SO2-containing off-gas flows into the w

    Jan 1, 1995

  • TMS
    Naoshima Smelter Operation Present and Future -

    By E. Oshima

    In May 1991, a New Mitsubishi Continuous Copper Smelter Line started operation at Naoshima. Recently, it has been continuing steady operation and one and a half year campaign life has been achieved. I

    Jan 1, 1998

  • TMS
    Process Control Technology Asarco Hayden Arizona Copper Smelter

    By G. Coryell, E. Brack

    "Remaining competitive in today's metal markets requires that copper smelters utilize the latest technology offered in process control, data acquisition, and process optimization. State-of-the-art too

    Jan 1, 1989

  • TMS
    Aqueous Pressure Oxidation of Silver-Bearing Cyanide Refractory Concentrates in Acidic Sulfate and Sulfate-Iodide Media

    By G. Van Weert

    Refractory gold ores and auriferous concentrates containing silver tend to form refractory silver jarosites during pressure oxidation. Earlier work with pure Ag2S has shown that the addition of iodine

    Jan 1, 1994

  • TMS
    Advancements In Smelter Gas Handling And Treatment At Magma Copper

    By Kenneth L. Driggs

    The Environmental Protection Agency's Clean Air Act of .1970 provided the driving force for the current Magma Smelter configuration. The historical and technical perspectives of those process dev

    Jan 1, 1992

  • TMS
    Zinc Extraction From Eaf Dust With Ezinex® Process

    By Marco Olper

    The Italian company Engitec Impianti has developed a new electrochemical technology for the treatment of Electric Arc Furnace (EAF) flue dust generated in steel mini-mills. This process is based on a

    Jan 1, 1995

  • TMS
    Low Cost Titanium -Myth or Reality

    By Paul C. Turner

    In 1998, approximately 57,000 tons of titanium metal was consumed in the form of mill products (1). Only about 5% of the 4 million tons of titanium minerals consumed each year is used to produce titan

    Jan 1, 2001

  • TMS
    Flash Smelting at Magma Metals Company San Manuel Smelter

    By Tom W. Gonzales

    Magma Metals Company commissioned a 3000 tpd Outokumpu flash smelting furnace in July 1988. Through September 1992 the PSP has smelted a first campaign record 4.1 million tons of concentrate. This pap

    Jan 1, 1993

  • TMS
    Evolution Of The Mega-Scale In Ferro-Alloy Electric Furnace Smelting

    By Lloyd Robert Nelson

    The historical progression in installed electric furnace smelting capacity of some 1650 calcium, chromium, manganese, nickel and silicon ferro-alloys furnaces is reviewed. Key increases in the inheren

    Jan 1, 2014