Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Kinetics of the Precipitation of Goethite from Ferrous Sulphate Solutions using Oxygen-Sulphur Dioxide MixturesThe oxidation of ferrous ions by oxygen in sulphate solutions is a very slow process, but it tills long been known that the addition of sulphur dioxide increases the rate of reaction very significantl
Jan 1, 1991
-
Solvent Extraction Of Vanadium From Converter Slag Leach Solution By P204 ReagentBy ZHANG Ting
In view of the high consumption and contamination of traditional vanadium extraction technology, a new process of leaching the converter vanadium slag without roasting with titanium dioxide waste was
Jan 1, 2015
-
Florida Mountains' Plutonic Rocks (Luna County, New Mexico) are Precambrian AgeBy Russell E. Clemons
Coarse-crystalline granite, quartz syenite, syenite, meladiorite, and anorthosite in the Florida Mountains, southeast of Deming, New Mexico, were originally mapped as Precambrian. They were remapped i
Jan 1, 1982
-
Brief Overview Of The Baia Mare Dam BreachBy Frederick W. DeVries
The author was invited by "60 Minutes Australia" to provide on-site technical background on cyanide, mining, and the environment, in their investigation of the January 30, 2000, spill at the Aurul go
Jan 1, 1998
-
Computer Simulation of Mold Filling ProcessesBy E. Gutierrez-Miravete
A computational method for the simulation of mold filling processes is described. The method is based on the representation of the flowing or deforming medium as a collection of mutually interacting p
Jan 1, 1992
-
Thermodynamic Modeling of KIVCET Lead ProcessBy Pengfu Tan
A thermodynamic model of KIVCET lead smelting process has been developed. The model has the capability to predict the distribution behaviors of Pb, Zn, Fe, S, O, As, and heat balance in KIVCET direct
Jan 1, 2006
-
Mining And Refining Of Materials From Municipal WasteBy Patrick F. Mahoney
Each year in the United States over 10 million tons of metal are discarded with our municipal waste. This, includes, not only ferrous metals, aluminum and copper but gold, silver, platinum and every o
Jan 1, 1995
-
The Application Of Six Sigma Methodologies To Improve The Quality Of Converter Slag At Atlantic CopperBy Jesús Contreras
Within its programme for continuous improvement and cultural change, Atlantic Copper has installed the Six Sigma methodology as a basic tool for the improvement of management techniques in all its pro
Jan 1, 2005
-
A Thermodynamic Model For The Reaction Zone Of Lead Blast FurnaceBy Pengfu Tan
A thermodynamic model has been developed to predict the distribution behaviors of Cu, Fe, S, O, Pb, Zn, As, and heat balance in a lead blast furnace. The modeling results have been validated by the pl
Jan 1, 2005
-
Dross Reclamation at Aluminum Melting Furnace SitesBy Daniel E. Groteke
This paper describes a new technology which allows aluminum drosses to be processed at the generating melting furnace to recover available metallic values. The systems, offered in both manual and auto
Jan 1, 2000
-
New Clean Technologies to Improve Lead-Acid Battery RecyclingBy C. Frias, M. Garcia, G. Diaz
Advances in hydrometallurgy promoted by Tecnicas Reunidas are providing increasingly simple and clean means for controlling the entire lead recycling chain. Used in parallel with pyrometallurgy, these
Jan 1, 2000
-
Technology For Production Of Aluminum AlloysBy A. V. Tarasov
One or more of the main alloying metals, i.e. copper, silicon, nickel, magnesium, zinc and other metals can form a composition with aluminum, by dissolving in the latter. The thermodynamic computa
Jan 1, 2006
-
Materials From Ferroalloys III - High Energy Synthesis Of Oxide Materials From Combustion Of Niobium NitrideBy James A. Sommers
Combustion of niobium nitride powder in a stream of oxygen results in several niobium oxide phases, depending upon reaction parameters. Under rapid oxygen flow, the oxidation produces a molten mass wh
Jan 1, 1995
-
High-Efficiency Reactors For Obtaining Metal PowdersBy T. Lezhava
A new reactor model with rotating cathodes has been developed where various forms (dendrite, spongy) of metal depositions and their uninterrupted removal are accomplished by the realization of high cu
Jan 1, 2006
-
First Year Of Operation Of The Noranda Continuous ConverterBy Y. Prévost
The Noranda Continuous Converting Process was commissioned in November 1997 at the Home smelter in Rouyn-Noranda, Quebec, Canada. It has completed over 18 months of successful operation. Excellent tea
Jan 1, 1999
-
Study on CaSO3.0.5H2O Typed Flue Gas Desulfurization Gypsum Used as Cement RetarderBy Zhendong Tao, Wei Huang, Zhongxi Yang, Hang Guo, Haoran Geng, Jingxiang Yao
"CaSO3.0.5H2O typed Flue Gas Desulfurization (FGD) gypsum is a by-product formed in flue gas desulfuration by double-cycle fluid bed method, its composition is different remarkably from that of gypsum
Jan 1, 2008
-
Sorption Concentration of Platinum Group Metals from Nitrate SolutionsBy Andrew Shabalin, Vladimir Skorohodov, Svetlana Babaeva, ?lga Makovskaya
"At processing of some kinds of wastes (electronic scrap, secondary materials, spent nuclear fuel) in nitric acid solutions, and also in technology of silver refining, the significant amounts of palla
Jan 1, 2008
-
Study On Several Important Hydrometallurgical Methods Of Fe Removal From Zn, Mn, Cu, Ni, Co EtcBy Wenshan Zhang
Three important methods of removing Fe in hydrometallurgy of zinc, manganese, copper, nickel, cobalt and etc are described, including neutralized hydrolysis method, jarosite method and goethite method
Jan 1, 2006
-
Extraction Of Rare Earths From A Low-Grade, Kaolinitic Ore By Percolation LeachingBy Chi Ru?an
Sollutions of ammonium chloride, nitrate and sulfate were studied in extraction of rare earths absorbed on a low-grade, kaolilnitic ore recently discovered in southern China. The results of percolatio
Jan 1, 1989
-
The Steps Required to Meet Production Targets at PT TNCO, Indonesia: A New Innovative Business StrategyBy Chris Doyle
From 1997-2000. PT INCO undertook the Fourth Line Expansion Project (FLEX) to increase annual production rates from 90-100 to 150 Mlbs Ni/year (68,000 MT Ni/yr). In 2003, PT INCO nickel production und
Jan 1, 2004