Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Equipment Selection for Chloride Circuits

    By G. R. Waters

    NMR360 is developing a suite of chloride-based metals extraction processes, with the first commercial operation scheduled for commissioning late in 2018. It is critical, therefore, that with the intro

  • TMS
    Commercial Implications Of Direct Copper Smelting

    By R. J. McClincy

    The potential techniques for the direct smelting of copper sulfide concentrates to blister copper were evaluated from the standpoint of commercial application. Many existing smelters are adaptable to

    Jan 1, 1983

  • TMS
    In-Situ Characterization of Sintering Properties with Non-Contact Ultrasonic Measurements

    By James C. Foley, David K. Rehbein

    "In-situ characterizations of green state part density and sintering state have long been desired in the powder metal community. Recent ·advances in non-contact electromagnetic acoustic transducer (EM

    Jan 1, 2000

  • TMS
    Study of the Diffusion of Cu(II) as an Oxidant Through Simulated Particle Pores in a Novel Model Apparatus

    By B. Manana

    In heap leaching, the oxidative dissolution of value minerals encapsulated deep within large particles cannot be fully understood on the basis of the bulk solution conditions relative to variable solu

  • TMS
    Sulfur Fixation at High Temperature Within the Copper Smelting Process

    By N. A. Warner

    Fundamental studies on the reaction of limestone or dolomite at high temperature with S02 are extended to the realm of large scale primary copper smelting. Whereas flue gas desulfurisation in the elec

    Jan 1, 1996

  • TMS
    The Treatment Of Metallurgical Wastes Using The Enviroplas Process

    By N. A. Barcza

    DC plasma-arc technology using a hollow graphite electrode (cathode) has been successfully implemented in the primary metallurgical industry in South Africa up to the 30 MW scale. Mintek has applied i

    Jan 1, 1994

  • TMS
    Advances In Gas Cleaning Technology

    By P. D. Nolan

    Smelters operating under pollution control orders have become increasingly dependent upon the reliable operation of sulphuric acid plants and no factor affects the long term reliability of those plant

    Jan 1, 1983

  • TMS
    Cyprus Miami Mining Corporation Smelter Modernization Project Summary and Status

    By Ross R. Bhappu

    Anticipating a major power cost increase in 1990, Cyprus Copper Company decided to modernize the Miami Smelter at a cost of $92.5 million. The modernization project included the addition of an Isasmel

    Jan 1, 1994

  • TMS
    Oxygen Plant Characteristics for Metallurgical Operations

    By Helmut Attlfellner

    The selection of the best process for the oxygen generator for a metallurgical process requires the determination of all aspects which impact the economics of this facility. Concepts and features of m

    Jan 1, 1992

  • TMS
    Low Cost Options for Gas Compositional Analysis of Product Streams of Oxy-Combustion Processes with Carbon Capture (an Overview)

    By John A. Clark, Danylo Oryshchyn, Casey Carney, Stephen Gerdemann, Cathy Summers, Thomas Ochs

    "Limited analysis of combustion gas streams where carbon capture is not of interest is done mainly to ascertain operation parameters. Stringent regulations on acid gases and particulates promote caref

    Jan 1, 2010

  • TMS
    A Review: Solar Thermal Reactors for Materials Production

    By Geoffrey Brooks, Ben M. Ekman, M. Akbar Rhamdhani

    "Concentrated solar collectors including solar simulators have been studied to concentrate solar radiation to flux levels capable of reaching temperatures of 3000K. Currently, there are no industrial

    Jan 1, 2014

  • TMS
    The Continuous Pressure Filtration of Zn-Leaching Residue in a Brazilian Preparation Plant

    By Reinhard Bott

    The Companhia Mineira de Metais (Brazil) runs a Zn-recovery plant in Tres Marias, federal state Minas Gerais, Brazil. The Zn-production is about 65,000 t/a, This corresponds to a concentrate throughpu

    Jan 1, 1990

  • TMS
    Removal Of Arsenic From Effluents -A Comparison Between FeSO4 / Air And FeSO4/H2O2 Systems

    By Luiz A. Teixeira

    This paper reports the results of kinetic studies involving the precipitation of arsenic from aqueous solutions as FeAs041 Fe(OH)3' using FeS04 as source of Fe ions, and Air or H202 as oxidizing

    Jan 1, 1996

  • TMS
    Oxygen Production Technologies

    By K. J. Murphy, A. R. Smith, A. P. Odorski

    "The need for large quantities of oxygen for use in metallurgical processes was a major driving force in the commercialization of tonnage air separation plants. Oxygen, nitrogen and argon impact the q

    Jan 1, 1988

  • TMS
    Lead-Free Solder to Meet new safe Drinking Water Regulations

    By T. S. Bannos

    Section 1417 of the Safe Drinking Water Act Amendments enacted by the O.S. Congress prohibits the use of lead containing solders for potable water systems in new construction or when making repairs. T

    Jan 1, 1990

  • TMS
    Process Control Improvements at the Kennecott Utah Copper Smelter

    By Robert M. Leary

    The Kennecott Utah Copper smelter operates two Outokumpu flash furnaces: a smelting furnace for production of high-grade matte and a converting furnace for production of blister copper. Flash furnaces

    Jan 1, 2000

  • TMS
    Improving Copper Smelting Process, Capacity, and Costs- The Answer is Outokumpu Flash Smelting

    By M. Jortikka

    The smelting process of the old reverberatory furnace including its capacity has been improved over the years in different ways eg. with oxy-fuel burners, parallel reactors with the reverb or with var

    Jan 1, 1994

  • TMS
    Removal Of Nickel From A Complex Chemical Process Waste: Results And Key Learnings

    By Jerry D. St. Clair

    A multidisciplinary team of scientists and engineers at Wont has been working to understand heavy metal contamination of DuPont process waste streams and technologies for abatement of these metals. As

    Jan 1, 1994

  • TMS
    Simulation of Combustion and Metal Heating in a Mobile Heat Treatment Furnace

    "In this paper, a mobile heat treatment furnace from Akkermans Gloeitechniek, a Dutch company, was simulated with Computational Fluid Dynamics (CFD). The furnace is cylindrical with four oil burners,

    Jan 1, 2004

  • TMS
    Operations at the Doe Run Company's Buick Resource Recycling Division

    By Moenster J. A., M. J. Sankovitch

    Doe Run's Buick Smelter was converted from a primary lead smelter to a secondary lead smelter in 1991. The recycling facility was designed to produce 60,000 tons of refined lead per year from 110,000

    Jan 1, 2000