Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    The Separation Of Precious Metals From Base Metals In Gold-Antimony Alloys By Selective Chlorination Leaching Under Controlling Potential

    By Yang Tian-zu

    The separation of precious metals from base metals containing in gold-antimony alloys by selective chlorination leaching under controlling potential was studied in this work. The effects of the consum

    Jan 1, 2006

  • TMS
    Effect Of The Hydration Condition On The Synthesis Characteristics Of Aragonite-Precipitated Calcium Carbonate

    By Jung-Ah Kim

    Precipitated Calcium Carbonate (PCC) is obtained through calcination, hydration, and carbonation. Thus, the change in each process condition determines the particle size or morphology of PCC. To date,

    Jan 1, 2006

  • TMS
    Effect Of Clay Slimes On Copper, Molybdenum Flotation From Porphyry Ores

    The presence of clay adversely affects the floatability of copper and molybdenum during processing porphyry copper/molybdenum ores. In addition, reagent consumptions are much higher than when treating

    Jan 1, 1999

  • TMS
    Remembrance Of Academic Mentors And Early Associates (ae4c75c0-2487-4bea-ac88-e511bef318d8)

    By Hong Yong Sohn

    On the occasion of this symposium in my name, I reflect upon the contributions of my academic mentors and early associates who helped shape my professional career. I was fortunate to have these people

    Jan 1, 2006

  • TMS
    The Optimisation and Control of Process Chemistry at Bulong Nickel Operations (abstract only)

    By John Frederick Colloghon, O&apos

    Bulong remains the only hydrometallurgical process plant in the world that recovers nickel and cobalt directly from high pressure acid leach (HPAL) laterite leach liquors without need for precipitatio

    Jan 1, 2004

  • TMS
    Application of the Mineralogy of the Cobalt-Nickel-Silver Ores of Cobalt, Ontario to Metallurgical Treatment

    By W. Petruk

    The silver-rich cobalt-nickel arsenides ores of the Cobalt area in Ontario, Canada were mined for silver from about 1904 to 1985. The ores contained about 8 oz to 100 oz Aglt and about 1 wt% Ni and 2

    Jan 1, 1993

  • TMS
    Mine Site Production Of Value Added SX-EW Copper Products - The Alternative To Cathode

    By S. J. Kohut

    Until recently SX-EW technology has only been used to produce conventional cathode for the cyclical commodity marketplace. Unlike electrorefining, SX-EW lends itself to the integration with the downst

    Jan 1, 1999

  • TMS
    Experimental Study On The Simultaneous Desulphurization And Denitrification By Duct Injection

    By Qin Li

    An highly active absorbent with oxidization based on fly ash, lime and additives was prepared. Experiments of simultaneous desulphurization and denitrification were carried out using fixture bed and d

    Jan 1, 2006

  • TMS
    Influence Of Environment On The Copper Patinas

    By M. A. Llavona

    The study of the formation and components of copper patina and its conservation has assumed great importance. The changing environment has accelerated the processes of patinas degradation; thus, the e

    Jan 1, 1999

  • TMS
    Conflicts over Designs, Refractories and Awards: The First 20 Years of PS Experience

    By Larry Southwick

    This paper covers technical and other developments during the first 20 years of Peirce-Smith converting. There were numerous mechanical and process ideas and concepts already being developed and used

    Jan 1, 2009

  • TMS
    Recycled Polyethylene Composites Reinforced With Jute Fabric from Post –Used Sackcloth – An Environmentally Correct Building Material

    By Amanda C. Lima, Luiz Augusto H. Terrones, Sergio N. Monteiro

    "Fabric from weaved yarns made of jute fibers have been considered as reinforcement for polymeric composites. In particular, these fabrics obtained from discarded sackcloth are presently being investi

    Jan 1, 2008

  • TMS
    Development Of Zinc Production At The Chelyabinsk Zinc Plant

    By L. A. Kazanbayev

    The Chelyabinsk Electrolytic Zinc Plant (CEZP) was commissioned in 1935. Over the elapsed years the Plant capacity has been increased from 10 thousand tons of zinc (1935) to 150 thousand tons of zinc

    Jan 1, 2006

  • TMS
    Concentration Histories And Wave Fronts In The In Situ Leaching Of Uraninite By Peroxide Carbonate Bicarbonate Solution: Effects Of Component Concentrations

    By KNona C. Liddell

    The time and spatial dependence of component and species concentrations during in situ uraninite leaching have been modeled using a reactive transport model based on partial equilibrium between reacti

    Jan 1, 1995

  • TMS
    Heavy Metal Immobilisation In Silicate Slags

    By C. P. Broadbent

    Due to growing .public awareness of environmental issues and greater sensitivity towards waste management, many countries around the world are implementing more stringent legislation governing the sto

    Jan 1, 1994

  • TMS
    The Effect Of Dissolved Manganese On Anode Activity In Electrowinning

    By Lauri Pajunen

    DSA-anodes are widely used in metal electrowinning. In zinc electrowinning the electrolyte solution contains manganese ions, and the deposition of manganese dioxide happens on the anode. This manganes

    Jan 1, 2003

  • TMS
    Dissolution And Precipitation Processes In The Secondary Separation Of Rare Earths

    By K. Osseo-Asare

    Aqueous stability diagrams (25°C) are presented for the systems M-H2O and M-Oxalate-H2O where M=Sm, Nd, Co, and Fe. With the aid of these diagrams (i.e., Eh-pH and log[Metal]- log[Oxalate]), the solut

    Jan 1, 1997

  • TMS
    Purification Of Waste Water From Ions Of Heavy Metals

    By T. Lezhava

    For the purification of quarry waters from copper and their further utilization a three-sectional electrochemical reactor is constructed providing the extraction of 90-95% copper as a self-loosing pow

    Jan 1, 2006

  • TMS
    The Greenstone Resources Ltd. Santa Rosa Heap Leaching Project, Panama

    By Randy Martin

    "Greenstone Resources Ltd. constructed and operates the Santa Rosa open pit, heap-leach gold mine in Veraguas, Panama. The project was commissioned in 1995 at a designed capacity of 1.8 million tons p

    Jan 1, 1997

  • TMS
    Kinetic Study On The Solvent Extraction Of Yttrium Chloride With HEHEHP Using A Rotating Diffusion Cell

    By R. Cheng

    The kinetics of the solvent extraction of ythium from HCl solution with mono-2-ethyl hexyl phosphonic acid mono-2-ethyl hexyl ester (HEHEHP) have been studied using a rotating diffusion cell (RDC). Th

    Jan 1, 1992

  • TMS
    Recent Developments in the Lead Refining Operations at Britannia Refined Metals Ltd.

    By P. J. Moor

    Britannia Refined Metals Ltd. was built in 1931 to refine the lead bullion produced at the Mt. Isa mine in Queensland, Australia. Several periods of expansion and development have taken place over the

    Jan 1, 2000