Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Two Steps Forward and One Step Back: A Case of Arrested Development in Laterite Processing

    By Larry M. Southwick

    Considerable process and equipment development and analysis were conducted during design of Freeport Sulfur's laterite nickel facilities in the late 1950's. These covered ore concentration a

    Jan 1, 2004

  • TMS
    Modification of Solid Reactivity by Chemical Vapor Infiltration: The Upgrading of Coke and Other Carbons

    By Y. Shigeno

    The reactivity of a porous solid is a strong function of its pore structure (porosity, pore surface area and pore size distribution). It follows that reactivity could be altered by altering pore struc

    Jan 1, 1993

  • TMS
    Recovery Of Metals From Copper Smelter Furnace Flue Dust

    By H. H. Law

    Large amounts of waste material in the form of flue dust are generated in the operation of copper smelter furnaces. As a result of increasingly stringent disposal, it has become important to develop m

    Jan 1, 1992

  • TMS
    Rigs From Iron Containing Dusts & Sludges

    By Christopher M. Moore

    DK Recycling und Rohelsen GmbH converts 380 000 annual tonnes of iron containing waste materials Into pig Iron. Zinc Is the main reason that these materials are classified as waste. The materials are

    Jan 1, 1995

  • TMS
    Converting Furnace Upgrades At The Kidd Metallurgical Division Copper Smelter

    By A. MacRae

    Campaign life of the converting furnace has been limited by break-outs through the hearth and walls. Throughput of concentrate has increased by 60% since start-up of the copper operations in 1981. Th

    Jan 1, 1998

  • TMS
    Nickel and Copper Smelting at Inco's Copper Cliff Smelter

    By C. Landolt

    Inco's Copper Cliff Smelter Complex produces some 11 5,000 tonnes per year of nickel and 120,000 tonnes per year of copper. The Smelter flowsheet has changed a number of times over the years. The

    Jan 1, 1993

  • TMS
    CFD Modeling of Sintering Phenomena during Iron Ore Sintering

    By Dieter Neuschiitz, Pengfu Tan

    "In order to understand the sintering phenomena during iron ore sintering process, a CFD model of iron ore sintering has been developed, combining with the kinetics of 15 relevant chemical reactions w

    Jan 1, 2004

  • TMS
    Advances In Sulfide Smelting -Technology, R&D, And Education

    By H. Y. Sohn

    The considerable progress made in the sulfide smelting technology since the first International Sulfide Symposium of 1983 is discussed. The new developments and innovations have largely been driven by

    Jan 1, 1998

  • TMS
    Towards Ad 2000

    By T. R. A. Davey

    The technologies of lead, zinc and tin extraction have made varying degrees of progress over the past twenty years. Producers of all metals have faced increasing demands for reduction of pollution and

    Jan 1, 1990

  • TMS
    Kennecott Utah Copper Smelter Modernization (8900290e-0a5a-4331-88e1-53de0cc3185e)

    By C. J. Newman

    Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,

    Jan 1, 1998

  • TMS
    Dry Granulation of Molten Blast Furnace Slag and Heat Recovery from Obtained Particles

    By Xuewei Lv, Yuelin Qin, Guibao Qiu, Chenguang Bai

    "Blast furnace slag (BF slag), is the main by-product in the ironmaking process, which contains large amounts of sensible heat. To recover the sensible heat, this paper described the hot experiments w

    Jan 1, 2012

  • TMS
    Aluminum Smelter Waste Heat Recovery Plant (Heat Exchangers Fouling and Corrosion-a Detailed Investigation)

    By Reza Kamali, Mohsen Bashiri, Hadi Fanisalek

    "Nomenclature: A: area (m2), C: heat capacity (WIK), cp: specific heat (J/Kg K), d: internal tube diameter (in), F: correction factor for multi-pass and crossflow heat exchanger, h: convective heat tr

    Jan 1, 2012

  • TMS
    Process Control Modernization At The Inspiration Smelter

    By J. B. Winter

    The present Inspiration Consolidated Copper Company Smelter/Acid Plant complex located near Miami, Arizona, was designed and built specifically to conform to the ambient air quality standards imposed

    Jan 1, 1983

  • TMS
    Oxidation of FeCl3 Using Radicals Produced in a Non-Equilibrium Oxygen Plasma

    By David C. Lynch

    FeCl3 particulate of 10 to 100 um in diameter was reacted with radicals produced in an oxygen plasma at pressures between 1 to 20 Torr. The particulate, in a fluidized bed, was positioned above the pl

    Jan 1, 1996

  • TMS
    Decision-Making Software for the Incremental Improvement of Peirce-Smith Converters

    By Alessandro Navarra, Joël P. T. Kapusta

    "The converting cost modeling software introduced by Ng et al. in 2005 [1] has been extended to consider the reprocessing of reverts and copper scrap. The original model evaluated the operational cost

    Jan 1, 2009

  • TMS
    Active Oxidation And Fume Formation From Liquid Simn

    By Linfeng Zhou, Rong Sun, Guanghui Li, Zhiwei Peng, Tao Jiang

    Dust, or airborne particulate matter, from metal smelting can be either mechanically or thermally generated and it negatively affects the indoor air quality as well as the fugitive emissions from the

    Jan 1, 2016

  • TMS
    Recent Developments In Electric Furnace Smelting Technology At Mufulira Zambia

    By I. S. Blair

    The introduction of the 36 MVA smelting furnace at Mufulira, and the experience gained during the first five years of operation have been described previously (6). Based on this experience the furnace

    Jan 1, 1983

  • TMS
    Improving Copper Smelting Process, Capacity, and Costs- The Answer is Outokumpu Flash Smelting

    By M. Jortikka

    The smelting process of the old reverberatory furnace including its capacity has been improved over the years in different ways eg. with oxy-fuel burners, parallel reactors with the reverb or with var

    Jan 1, 1994

  • TMS
    Cyprus Miami Mining Corporation Smelter Modernization Project Summary and Status

    By Ross R. Bhappu

    Anticipating a major power cost increase in 1990, Cyprus Copper Company decided to modernize the Miami Smelter at a cost of $92.5 million. The modernization project included the addition of an Isasmel

    Jan 1, 1994

  • TMS
    Silver Leaching Fundamentals

    By D. M. Wyslouzil

    The fundamentals of dissolving silver and silver minerals are discussed in the following sections: 1) Basic chemical reactions in the silver system 2) Leaching of pure silver minerals 3) Leaching o

    Jan 1, 1990