Search Documents

Sort by

  • CIM
    Structure at Depth on the Plains of Alberta

    By Ralph L. Rutherford

    Introduction During the past twenty-five years we have seen considerable exploration for oil on the plains of southern and east-central Alberta. This exploration has to some extent gone on in cycle

    Jan 1, 1946

  • CIM
    Structure Drilling in Oil Exploration, Southern Alberta

    By G. M. Furnival

    A PROGRAMME of structure drilling was commenced in the Southern Alberta Plains in June, 1943, for the purpose of determining the geological structure of the underlying sediments. More than 270 holes h

    Jan 1, 1945

  • CIM
    Structure of Gold Deposits in the Crow River Area, Ontario

    By Jas. E. Thomson

    PUBLIC attention was first attracted to the Crow River area of north-western Ontario by the discovery of gold in 1928. The first three discoveries were eventually developed into Central Patricia, Pick

    Jan 1, 1938

  • CIM
    Structure of Northern New Brunswick

    By W. Holyk

    "Although lead, zinc, copper, and iron sulphides have been known for many years in the Bathurst region, the existence of large massive deposits was not known until the discovery of the Brunswick orebo

    Jan 1, 1949

  • CIM
    Structure of the Eastern Townships of Quebec

    By H. C. Cooke

    "The Part of the Eastern Townships dealt with in this paper is shown in the accompanying figure. Each rectangle represents one of the topographic maps published by the Department of National Defence o

    Jan 1, 1949

  • AIME
    Structure of the Mining Engineering Profession

    By Theodore J. Hoover

    WHAT are the chief branches of the mining engineering profession today? In an effort to analyze the structure of the profession, for practical purposes, a quantitative study has been made of the membe

    Jan 1, 1935

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • CIM
    Structure, Mineral Distribution and Wallrock Alteration of the No. 7 Vein, Opemiska Copper Mine

    By A. J. Ouellet, A. Coulombe, B. Salmon

    The no. 7 vein system cuts the Ventures gabbro which has undergone folding and fracturing; the latter, in response to movement on the nearby Campbell Lake fault. It fills a shear fracture which pinche

    Jan 1, 1984

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an

    Jan 1, 2012

  • SME
    Structure-Tectonic Setting Of Late Cretaceous-Early Tertiary Ore Deposits In The Rocky Mountain Region

    By T. L. Heidrick

    Late Cretaceous-early Tertiary Cordilleran porphyry Cu-Mo districts and their consanguineous Zn-Pb-Ag-Au-W vein and replacement deposits of the Rocky Mountain region comprise one of the largest, best

    Jan 1, 2013

  • SME
    Structured approach for integrating process-control, engineering and business systems

    By J. M. Applegate, C. L. Morgan

    Introduction In the same way that a blueprint communicates informa¬tion about a structure, a systems architecture should provide information that guides the construction and implementation of a compu

    Jan 1, 2000

  • IMPC
    Structuring a Flotation Model for Robust Prediction of Flotation Circuit Performance (7584c761-5176-405d-b074-02905d9acd7e)

    By E. V. Manlapig, M. C. Harris

    "The complexity of the flotation process has made the identification of an appropriate model structure, for use in the prediction of flotation circuit performance, far from obvious. Work performed und

    Jan 1, 2003

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • AIME
    Student Employment Problem

    By KENNETH CROPPER

    USUALLY we forget about the things which move along smoothly. There are no causes for worry when there are no troubles. But when troubles arise we must put forth some thought and effort to alleviate t

    Jan 1, 1931

  • AUSIMM
    Students Response to the Challenge

    By C Rees, M Predebon, J Denney

    It has been said on many occasions that æthe future of the mining industry of Australia, and indeed the world, lies in the hands of the studentsÆ. As a student, this can be a daunting, yet very exciti

    Jan 1, 2000

  • SME
    Studies for Extraction and Separation of Rare Earth Elements by Adsorption from Wastewater: A Review - Mining, Metallurgy & Exploration (2024)

    By Fika Rofiek Mufakhir, Amru Daulay, Widi Astuti, Slamet Sumardi, Lukman Hakim Nasution, Hendra Prasetia

    Rare earth elements (REEs) are utilized in numerous disciplines, including chemical engineering, the nuclear industry, metallurgy, medicine, electronics, and computer technology. Recycling products co

    Apr 3, 2024

  • IMPC
    Studies In Column Flotation To Recovery Carbon Matter From Coal Tailings

    By I. A. S. Brum

    Brazil has large reserves of coal (7 billion tons) located predominantly in the south of the country. Despite the relative ease of exploitation, these resources have been underestimated as a source of

    Sep 1, 2012

  • CIM
    Studies in the casting of AA6111 strip on a horizontal, single belt, strip casting simulator

    Strips of AA6111 automotive alloy were cast on a horizontal single belt strip casting simulator, Pure copper and carbon steels substrates plasma sprayed with different coatings for improving the strip

    Jan 1, 2005

  • SME
    Studies Of Anionic Reagents For Phosphate Beneficiation

    By P. Zhang

    A multiyear, comprehensive study of flotation reagents used in phosphate beneficiation was conducted. The study involved the evaluation of pure fatty acid compounds, comparison of various anionic coll

    Jan 1, 2009

  • SME
    Studies Of Friction Factor For Kentucky's Coal Mines

    By Andrzej M. Wala

    A knowledge of the friction factor (K-factor) is necessary in planning and designing mine ventilation systems for least cost and highest effectiveness. The friction factor used must be accurate and re

    Jan 1, 1991