Search Documents

Sort by

  • AIME
    Developing a Utah ?Cold Mine?

    By Fleming, R. C.

    ONE OF THE NEWEST developments of industry rising from the commercial application of scientific knowledge is in the making of solid carbon dioxide from the gas about 1925 the first efforts were made t

    Jan 1, 1932

  • SME
    Developing a Virtual Reality Environment for Mining Research

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    Developing a virtual reality environment for mining research (ME)

    By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jason Navoyski, Jennica L. Bellanca, William J. Helfrich

    Recent advances in computing, rendering and display technologies have generated increased accessibility to virtual reality. Virtual reality allows for the creation of dynamic, high-fidelity environmen

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • SME
    Developing an Evaluation Model for Economic Feasibility Analysis of Using Mechanical Boring Machines (TBM vs Roadheader) in one of the Largest Coal Reserves in Iran "Mining, Metallurgy & Exploration (2021)"

    By Sadegh Elyasi

    TBMand roadheader are two dominating excavation machines in underground tunnelling projects. The performance of these two tunnelling machines has been reviewed and analysed individually by many resear

    Feb 12, 2021

  • SME
    Developing an Integrated Flowsheet for Treating a Diversified Copper Ore Deposit

    By J. C. Gathje

    The Robinson copper ores were mined for many years from pits containing varying ore grades, sulfide and oxide ore types, and differing mineralogy. The ores also contain gold and molybdenum values, and

    Jan 1, 1992

  • CIM
    Developing and Equipping No. 4 Winze, San Antonio Mine

    By W. S. Hegler

    Introduction The San Antonio mine is on the north shore of Rice lake, thirty miles east of lake Winnipeg and 120 miles northeast of the city of Winnipeg. Since production was started in 1932, about

    Jan 1, 1949

  • SME
    Developing and Evaluating Pit Truck Safety Devices

    By W. C. Yates

    Lack of visibility from large, open-pit haulage truck cabs has become a serious safety problem. Anaconda conducted a research program to develop a low cost system to alert haulage truck operators to s

    Jan 7, 1982

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • SME
    Developing and Testing an Optimization Algorithm for Practical Open-Pit Pushback Design

    By Juan L. Yarmuch, Hyam Rubinstein

    Open-pit mine planning is a key process in the definition of mineral reserves and their efficient removal. Ore in open-pit mines is extracted bymining sequential pits called pushbacks. Pushbacks need

    Jun 25, 2023

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • AUSIMM
    Developing flotation circuit control and automation for the Phu Kham Copper-Gold Operation concentrator

    By L Mikhael Gurieff, D Baas

    The Phu Kham Copper-Gold Operation (Phu Kham Operation) is located in the Lao People's Democratic Republic and is owned and operated by the Lao-registered company, Phu Bia Mining Limited (PBM). Au

    Aug 29, 2018

  • SME
    Developing Functional Baselines

    By William W. Edgerton

    Establishing geotechnical baselines on soft ground projects that require the use of closed-face tunnel boring machines (TBMs) is difficult. It is hard to see the face when mining and the excavated mat

    Jan 1, 2012

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • SME
    Developing Information Management And Systems Analysis Procedures For Abandoned Mine Lands Site Selection

    By E. K. Albert

    In 1977, Congress enacted Title IV of the Surface Mining Control and Reclamation Act (SMCRA), providing for an "abandoned ml.ne reclamation fund". This fund, taken from a fee collected from operating

    Jan 1, 1990

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Developing Minerals Industry Leaders by Encouraging Metallurgical Excellence

    By N Bianco, D Drinkwater

    The professional skills shortage is intensifying, and commentators are predicting a shortfall in supply of qualified professionals for the mining industry, ranging from thousands to tens-of-thousands

    Oct 29, 2012