Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Legislative Action Important: Key Message at - SME Annual Meeting 2022By Steve Kral
The mining industry has waited a long time for the resurgence in commodity prices and demand for its products that it is now experiencing. Base and precious metals prices have reached levels not seen
Jan 1, 2005
-
Legislative And Regulatory Issues Facing Western Coal - Federal Leasing and the FutureBy Michael A. Poling
Ladies and gentlemen, I appreciate this opportunity to be with you, and to share my outlook on the future of Federal coal leasing. I'm told that you wanted the best speaker on this subject in th
Jan 1, 1986
-
Legume and Grass Revegetation of Mine TailingsBy C P. C David, J P. T Domingo
Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu
Jul 16, 2014
-
Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021By D. Nebbia, R. Aliberti, F. Solesin
The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren
Jun 13, 2021
-
Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium MineThe Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of
Jan 1, 2002
-
Lessons From The Granite Mountain Shaft Fire, Butte. - Introduction.By Daniel Harrington
On the night of June 8, 1917, the flame of a carbide lamp accidentally set fire to the uncovered and frayed insulation of an armored power cable near the 2,400-foot level of the North Butte Mining Co.
Jan 1, 1922
-
Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote
On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun
Jun 23, 2024
-
Lessons Learned and Best Practices ? Ontario?s Mining Sector Compressed Air System Energy Efficiency Pilot ProjectBy Ivor da Cunha
Ontario Mining Association (OMA) represents 57 members that are engaged in exploring, producing & processing mineral resources in an environmentally responsible manner. Conservation Bureau at the Onta
May 1, 2007
-
Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021By Todd Kilduff, Paul Wilkinson
Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project
Jun 13, 2021
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Lessons Learned From EPB and Slurry Tunneling in Glacially Deposited Soils in Seattle, Washington, USABy Shinichi Konda, Gary Nishimura
"Thousands of years ago large glaciers carved much of the landscape in Puget Sound, depositing abrasive and granular soils including cobbles and boulders along with layers of clay and sand. Tunneling
Jan 1, 2016
-
Lessons Learned From Expanding Al-Agoza Hospital in EgyptBy Nehad Elsafty
It is always necessary to expand existing buildings, so that they could meet the growing societal needs. Compared with demolishing them and then constructing new ones, the expansion of existing buildi
Aug 1, 2013
-
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation PlantBy B Newcombe
From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m
Sep 5, 2011
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
Lessons Learned From Near-Miss Events: Use of the Critical Decision Method to Identify Strategies to Improve Haul Truck Safety in Mining - SME Annual Meeting 2024By Jonathan K. Hrica, CASSANDRA L. HOEBBEL, Jennica L. Bellanca
Accidents involving powered haulage and mobile equipment such as haul trucks often account for the greatest number of fatalities in the mining industry each year. Despite previous analyses that have i
Feb 1, 2024
-
Lessons Learned from the East Malartic FireBy T. V. Nethery
Introduction A brief account of the East Malartic fire is essential if this paper is to serve the purpose implied by its title. The fire originated in the timbers of No. 4 shaft at the 10th, or
Jan 1, 1950
-
Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski
High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode
Jun 13, 2023
-
Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise designBy C Armstrong, B Wentzinger
Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top
Jul 23, 2018
-
Let's Be Practical Again A Focus On Midwest MiningBy Dale D. Teeters
Today, I would like to talk about ways to maximize the efficiency of surface coal operations. I doubt I will present any startling new ideas, but my comments may, hopefully, stimulate some conversatio
Jan 1, 1981
-
Letter Of Nomination - 26th International Conference on Ground Control in MiningBy Christopher Mark
Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl
Jan 1, 2007