Search Documents

Sort by

  • CIM
    Mathematical Models for Optimum Design of Grinding Circuits

    By A. L. Mular

    Some specific cases of the collection of data from industrial grinding and classifying operations, and the development of models from the data so obtained, will be described. The problems encountered,

    Jan 1, 1971

  • SME
    Mathematical Programming Applications In The Crushed Stone Industry

    By R. Venkataramani

    Crushed stone operations have become more difficult due to rising costs of labor and equipment, with the consequent reduction in profit margins. Competition from other operators and the encroachment o

    Jan 1, 1971

  • TMS
    Mathematical Simulation of Fluid Flow in Gas-Stirred Liquid Systems

    By Shoji Taniguchi, Lifeng Zhang, Kaike Cai

    "In the present paper, based on the two-phase (Eulerian-Eulerian) model, the 3D fluid flows in gas-stirred systems, i.e., air-stirred water vessel and argon-stirred liquid steel ladle, are simulated.

    Jan 1, 2000

  • CIM
    Mattagami River Refractory Clays

    By A. E. Hilder

    Introductory The following pages present the results of field investigations, laboratory and commercial tests, drilling, surveying, and preliminary development of the refractory clays which have been

    Jan 1, 1935

  • SME
    Maturi Deposit - Updated Mineral Resource Estimate

    "INTRODUCTION Twin Metals Minnesota (TMM) (operating as a joint venture between Duluth Metals and Antofagasta PLC) assumed control of the property in 2010. Amec became involved with the project in 201

    Jan 1, 2018

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • CIM
    Maximising Return On Your Improvement Efforts

    By Gareth Barnes

    Traditional approach to improvement is driven by good ideas from good people, but whilst the business case may sound good, when the project is complete, we often have not delivered on expectations.  W

    May 4, 2025

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • SME
    Maximization of Productivity Of Autonomous Equipment in Underground Mines

    By J. Paraszczak

    Underground metal mining involves many challenges. Economic slowdown, tough international competition and sometimes volatile metal prices put constant pressure on mine operators to increase productivi

  • SME
    Maximization of Productivity of Autonomous Trackless Loading and Haulage Equipment in Underground Metal Mines ? A Challenging Task

    By J. Paraszczak

    Application of teleoperated and automated (or ?autonomous?) mobile equipment in underground metal mines is a promising avenue for overcoming some of the challenges facing mine operators. These include

    Feb 23, 2014

  • ABM
    Maximização Do Desaguamento Dos Resíduos Minerais Gerados Pela Concentração Do Minério De Ferro

    By Gil Ribeiro Vilela Neto

    Na busca por se tornar cada vez mais sustentável, a indústria mineral vem recorrendo às soluções tecnológicas que minimizem o impacto ambiental gerado pela disposição dos rejeitos resultantes dos proc

    Aug 16, 2017

  • CIM
    Maximize Opportunities in Milling Operations

    By K. Kim

    "All milling operations would like to achieve the best possible recovery in combination with the highest achievable throughput. Unfortunately, many operations have problems with low recovery, low thro

    Jan 1, 2019

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025

  • CIM
    Maximizing Performance of FRP Equipment in Copper Extraction

    By Jeffrey D. Eisenman

    FRP is a proven material for the solvent extraction processes of copper production. There is a history of successful applications of FRP piping and equipment in hydrometallurgical processing. The perf

    Jan 1, 2019

  • IIMP
    Maximizing Project Value using a Multi-Scenario Deterministic Economic Model – A Case study of Silver-Lead-Zinc Project in Peru

    By Kevin Gunesch

    In the current difficult financial markets, only the best projects will advance to the next phases of development due to limited funding. Projects are consistently being evaluated by their initial Cap

    Oct 21, 2015